Exam 14: Lean Supply Chains
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
In designing a lean production facility layout, a designer should do which of the following?
(Multiple Choice)
4.9/5
(73)
In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?
(Multiple Choice)
4.7/5
(82)
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a kanban/lean production approach. What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?
(Multiple Choice)
4.8/5
(82)
The philosophy of making workers personally responsible for the quality of their output and where workers are expected to make the part correctly the first time and to stop the process immediately if there is a problem is called
(Multiple Choice)
4.8/5
(77)
The focus of the Toyota Production System is on elimination of waste and reduction in inventory.
(True/False)
4.8/5
(67)
Uniform plant loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.
(True/False)
4.9/5
(87)
A philosophy in which similar parts are combined into families, and the processes required to make the parts are arranged in a specialized workcell.
(Multiple Choice)
4.9/5
(80)
One of the many lean techniques that have been successfully applied in service firms is leveling facility load.
(True/False)
4.8/5
(82)
There is less uncertainty in service task times than with manufacturing.
(True/False)
4.9/5
(75)
"Quality at the source" requires factory workers to become their own inspectors.
(True/False)
4.9/5
(83)
To implement a flow process in developing a lean system a firm might do which of the following?
(Multiple Choice)
4.7/5
(92)
An inventory or production control system that uses a signaling device to regulate flows is a
(Multiple Choice)
4.9/5
(74)
Group technology (GT) is credited with which of the following benefits?
(Multiple Choice)
4.8/5
(87)
The goal of JIT production is to drive all inventory queues lower.
(True/False)
4.8/5
(86)
Group technology includes the set of psychological tests and training exercises given to group workers to ensure a high level of teamwork.
(True/False)
4.8/5
(75)
Value stream mapping is used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant.
(True/False)
4.9/5
(77)
To implement lean production schedules, a firm would do which of the following?
(Multiple Choice)
4.9/5
(86)
You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation?
(Multiple Choice)
4.7/5
(80)
Periodic inspection and repair designed to keep equipment reliable is called
(Multiple Choice)
4.9/5
(79)
Showing 61 - 80 of 85
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)