Exam 21: Material Requirements Planning
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?
Free
(Multiple Choice)
4.7/5
(69)
Correct Answer:
E
If annual demand is 12,000 units, annual holding cost is $15 per unit, and setup cost per order is $25, which of the following is the EOQ lot size?
Free
(Multiple Choice)
4.9/5
(74)
Correct Answer:
E
In a typical inventory status record, which of the following would you not expect to see?
Free
(Multiple Choice)
4.9/5
(75)
Correct Answer:
E
In this industry type, a final assembly is made from standard options that the customer chooses.
(Multiple Choice)
4.9/5
(73)
Which of the following industry types have high expected benefits from the application of MRP?
(Multiple Choice)
4.9/5
(89)
One of the main purposes of an MRP system is which of the following?
(Multiple Choice)
4.9/5
(76)
We would expect to see which of the following in an MRP system's inventory status file?
(Multiple Choice)
4.7/5
(93)
The least total cost method (LTC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
(True/False)
4.9/5
(79)
"Projected available balance" is a term referring to unsold finished goods inventory.
(True/False)
4.8/5
(86)
Which of the following is the planned-order release using an MRP program if the gross requirement is 670 and the inventory on hand is 600?
(Multiple Choice)
4.8/5
(77)
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup costs and carrying costs.
(True/False)
4.9/5
(74)
Which of the following is not a direct input to the material planning?
(Multiple Choice)
4.9/5
(97)
A lot-for-lot (L4L) lot-sizing technique does not take into account setup costs or capacity limitations.
(True/False)
4.9/5
(89)
Which of the following is a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost?
(Multiple Choice)
4.8/5
(80)
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
(True/False)
4.8/5
(90)
Under the lot-for-lot (L4L) lot-sizing technique as used in MRP, we would expect which of the following?
(Multiple Choice)
4.7/5
(80)
Net change MRP reflects the exact status of each item managed by the system in "real time."
(True/False)
4.8/5
(99)
The least unit cost method (LUC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
(True/False)
4.9/5
(77)
Showing 1 - 20 of 91
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)