Exam 21: Material Requirements Planning
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot size in which these are most nearly equal?
(Multiple Choice)
4.9/5
(86)
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
(True/False)
4.9/5
(80)
Which of the following can be used for lot sizing in an MRP system?
(Multiple Choice)
4.9/5
(94)
In this industry type, items are manufactured by machine rather than assembled from parts. These are standard stock items carried in anticipation of customer demand.
(Multiple Choice)
4.8/5
(77)
A master production schedule is an input to a material requirements planning (MRP) system.
(True/False)
4.7/5
(85)
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to smooth out and become even over time.
(True/False)
4.8/5
(79)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?
(Multiple Choice)
4.8/5
(82)
In an MRP program, the program accesses the status segment of an inventory record according to specific periods called which of the following?
(Multiple Choice)
4.7/5
(69)
In an MRP problem, A is an MPS item. Every A requires 2 B's and 3 C's. Every B requires 5 C's. All lead times are two periods. All initial inventory values are 0. Use lot-4-lot method for order quantities for all items. If gross requirement for A is 500 in period 8, what will be the planned order release for B in period 4?
(Multiple Choice)
4.8/5
(81)
In this industry type, Iitems are fabricated or assembled completely to customer specification.
(Multiple Choice)
5.0/5
(79)
Which of the following industry types will not benefit greatly from the application of MRP?
(Multiple Choice)
4.9/5
(81)
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
(True/False)
4.9/5
(70)
The lot-for-lot (L4L) lot-sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
(True/False)
4.9/5
(86)
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become "lumpy."
(True/False)
4.8/5
(74)
In an MRP problem, A is an MPS item. Every A requires 2 B's and 3 C's. Every B requires 5 C's. All lead times are two periods. Initial inventory value for A is 100, B is 200, and C is 0. Use lot-4-lot method for order quantities for all items. If gross requirement for A is 800 in period 9, what will be the planned-order release for B in period 5?
(Multiple Choice)
4.8/5
(85)
A modular bill-of-materials is the term for an item that can be produced and stocked as a subassembly.
(True/False)
4.9/5
(71)
Which of the following is most closely related to the reason a firm might implement MRP?
(Multiple Choice)
4.8/5
(74)
The customer grace period is a time span having some specified level of opportunity for the customer to make changes.
(True/False)
5.0/5
(72)
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup cost, carrying cost, and cost of stockouts.
(True/False)
4.7/5
(90)
Showing 41 - 60 of 91
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)