Exam 7: Manufacturing Processes
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
Work-center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
Free
(True/False)
4.7/5
(72)
Correct Answer:
False
A production environment where the customer is served "on-demand" from finished goods inventory is?
Free
(Multiple Choice)
4.8/5
(77)
Correct Answer:
D
In studying the product-process matrix describing layout strategies, which of the following is most appropriate?
I. As you move from project to manufacturing cell to continuous process, product volume increases while standardization increases.
II. As you move from project to manufacturing cell to continuous process, product volume decreases while standardization decreases.
III. As you move from project to manufacturing cell to continuous process, product volume increases while standardization decreases.
IV. As you move from project to manufacturing cell to continuous process, product volume decreases while standardization increases.
Free
(Multiple Choice)
4.8/5
(87)
Correct Answer:
A
Break-even analysis can be used to help decide whether to perform a task with a special-purpose machine or with a general-purpose machine.
(True/False)
4.8/5
(85)
Having stamping and drill press departments would imply which of the following types of layouts?
(Multiple Choice)
4.8/5
(67)
Suppose that you have two processes A and B for producing a widget. Process A has a fixed cost of $10,000 and per unit variable cost of $80.00. Process B has a fixed cost of $30,000 and the per unit variable cost is $40.00. The widget sells for $100 regardless of production Process used. During the next three years (your planning horizon for the widgets) you expect the economy to be pretty good with sales of widgets to be at least 700 units per year. You will
(Multiple Choice)
5.0/5
(80)
You are hired as a consultant to decide if your client should purchase a new, highly specialized piece of equipment. The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life. The initial investment to acquire and install the equipment is $256,000. The variable cost to produce each unit will be $15, and the selling price for the finished product will be $30. Which of the following best describes the situation the firm is facing?
(Multiple Choice)
4.9/5
(82)
Which of the following tend to have higher levels of inventory investment?
(Multiple Choice)
4.8/5
(70)
Which of the following is not a basic type of process structure?
(Multiple Choice)
4.8/5
(79)
Assemble-to-order means moving the customer order decoupling point from finished goods to components.
(True/False)
4.7/5
(73)
This tool defines how parts go together, their order of assembly, and often the overall material flow pattern.
(Multiple Choice)
4.8/5
(80)
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
(True/False)
4.8/5
(83)
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
(True/False)
4.8/5
(91)
In a work center, Machine A has a 10-minute set-up time per batch and a 2-minute per unit run time. Machine B performs the identical function but has a set-up time of 30 minutes and a 1-minute run time per unit. The work center makes products in batches ranging from 1 unit to 100 units. Assuming capacity is not a limitation on either Machine, in order to minimize the total processing time, on which batches should Machine B be used?
(Multiple Choice)
4.8/5
(84)
A process flowchart denotes what happens to the product as it progresses through the productive facility.
(True/False)
4.8/5
(87)
The term "assembly line" refers to progressive assembly linked by some material handling device.
(True/False)
4.8/5
(82)
Assume a fixed cost for a process of $120,000. The variable cost to produce each unit of product is $35, and the selling price for the finished product is $50. Which of the following is the number of units that has to be produced and sold to break even?
(Multiple Choice)
4.9/5
(80)
In studying positioning of inventory in supply chains, which, if any, of the following is most appropriate?
I. As order decoupling point moves towards source, inventory investment goes down.
II. As order decoupling point moves towards the source, customer lead time gets longer.
III. As order decoupling point moves towards the source, inventory investment increases.
IV. As order decoupling point moves towards the source, customer lead time is unchanged.
(Multiple Choice)
4.9/5
(94)
One methodology used to evaluate equipment investment decisions where the investment entails an initial investment, fixed costs, and variable costs is break-even analysis.
(True/False)
4.9/5
(86)
The time needed to respond to a customer's order is called the customer response time.
(True/False)
4.8/5
(80)
Showing 1 - 20 of 52