Exam 8: Facility Layout
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
The trend in office layout is toward smaller-and-smaller offices as well as offices without doors.
Free
(True/False)
4.8/5
(80)
Correct Answer:
False
The term retailscape refers to the physical surroundings in which the service takes place and how these surroundings affect customers and employees.
Free
(True/False)
4.9/5
(76)
Correct Answer:
False
In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?
Free
(Multiple Choice)
4.9/5
(90)
Correct Answer:
D
A manufacturing cell groups identical machines together to work on products having similar shapes and processing requirements.
(True/False)
4.8/5
(69)
You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes, and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?
(Multiple Choice)
4.9/5
(71)
When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?
(Multiple Choice)
4.9/5
(78)
Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped together?
(Multiple Choice)
5.0/5
(73)
When a single task time is longer than the desired workstation cycle time, the only option is to split the task into two or more tasks.
(True/False)
4.9/5
(76)
A workcenter layout is similar to the basic production layout format of job-shop.
(True/False)
4.8/5
(90)
A project layout is characterized by a high degree of task ordering.
(True/False)
4.9/5
(86)
The objective of a retail service layout is to maximize net profit per square foot of store space.
(True/False)
4.8/5
(69)
Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7, 4, 7, 8, 9, 4, 3, and 6 minutes, and the cycle time is 8 minutes?
(Multiple Choice)
5.0/5
(80)
This layout groups dissimilar machines to work on products that have similar shapes and processing requirements.
(Multiple Choice)
4.9/5
(79)
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes, and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency?
(Multiple Choice)
4.9/5
(93)
Which of the following is not a basic type of production layout format?
(Multiple Choice)
4.9/5
(62)
A project layout is characterized by a relatively low number of production units in comparison with workcenter and assembly-line formats.
(True/False)
4.9/5
(79)
In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?
(Multiple Choice)
4.9/5
(82)
If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes, the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.
(True/False)
4.7/5
(77)
The term ambient conditions refers to background characteristics of the service.
(True/False)
4.8/5
(80)