Exam 14: Lean Supply Chains
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.
Free
(True/False)
4.8/5
(81)
Correct Answer:
True
Lean production is a management philosophy and a pull system throughout the plant.
Free
(True/False)
4.9/5
(68)
Correct Answer:
True
The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.
Free
(True/False)
4.7/5
(82)
Correct Answer:
False
There is less uncertainty in service demand than with manufacturing.
(True/False)
4.9/5
(77)
When implementing a lean production system, a stabilized schedule is achieved using which of the following?
(Multiple Choice)
4.8/5
(73)
In the textbook, Toyota's Tai-ichi Ohno identified which of the following types of waste to be eliminated?
(Multiple Choice)
4.8/5
(84)
Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?
(Multiple Choice)
4.7/5
(73)
In setting up a Kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?
(Multiple Choice)
4.7/5
(77)
Lean suppliers tend to charge more; although, the extra charge is generally a good investment.
(True/False)
4.7/5
(89)
Consider the relationship between optimal lot size and set-up cost. Other things remaining the same, as the setup cost decreases,
(Multiple Choice)
4.8/5
(76)
JIT production means that we produce the product before it is required so the customer does not wait for the product.
(True/False)
4.9/5
(76)
A kanban control system uses a signaling device to regulate JIT flows.
(True/False)
4.8/5
(76)
In the textbook, Toyota's Tai-ichi Ohno identified which of the following types of waste to be eliminated?
(Multiple Choice)
4.8/5
(73)
Value stream mapping is used to visualize product flows through various processing steps.
(True/False)
4.8/5
(77)
In implementing a lean production system you should work with suppliers to do which of the following?
(Multiple Choice)
5.0/5
(78)
A schedule that pulls material into final assembly at a constant rate is a
(Multiple Choice)
4.8/5
(65)
In a Kanban card calculation problem, other things remaining the same (that is changing only one variable at a time) the,
(Multiple Choice)
4.9/5
(84)