Exam 14: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In Japanese manufacturing, automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.

(True/False)
4.8/5
(83)

You have been called in as a consultant to set up a kanban control system. The first thing you do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 1,200 per hour. You estimate the safety stock should be set at 5 percent of the demand during lead time. The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours. Which of the following is the number of kanban card sets necessary to support this situation?

(Multiple Choice)
4.7/5
(97)

Group technology is a philosophy wherein similar parts are grouped together and the processes required to make the parts are arranged as a work cell.

(True/False)
4.8/5
(81)

A kaizen burst is a symbol on a value stream map.

(True/False)
4.8/5
(73)

Applying lean concepts in manufacturing balances increases in cost with quality improvement.

(True/False)
4.7/5
(82)

Company unions in Japan exist to foster a cooperative relationship with management.

(True/False)
4.8/5
(92)

Calculating how many of each part were used in production and using these calculations to adjust actual on-hand inventory balances is called

(Multiple Choice)
4.8/5
(87)

One of the many lean techniques that have been successfully applied in service firms is the upgrading of quality.

(True/False)
4.7/5
(84)

Subcontractor networks are not very important in Japanese manufacturing.

(True/False)
4.8/5
(66)

Which of the following are related to lean production?

(Multiple Choice)
4.9/5
(82)

One of the few lean techniques that does not work well in service firms is demand-pull scheduling.

(True/False)
4.9/5
(80)

Which of the following statements holds true for kanban production control systems?

(Multiple Choice)
4.8/5
(84)

Lean production requires a "push and pull" system of inventory replenishment.

(True/False)
4.7/5
(73)

You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. You found that the number of Kanban cards needed is 47. Your client now tells you that they miscalculated the demand and the true demand is 300 per hour. All other things remain the same. What is the most appropriate answer from the choices below?

(Multiple Choice)
4.8/5
(73)

The term lean-procurement relates to automatic transaction, sourcing, bidding and auctions using Web-based applications, and the use of software that removes human interaction and integrates with the financial reporting of the firm.

(True/False)
4.8/5
(81)

An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced is called which of the following?

(Multiple Choice)
4.7/5
(79)

A signaling device used to control production is

(Multiple Choice)
4.7/5
(87)

Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900s.

(True/False)
4.7/5
(69)

Which of the following is not listed in the textbook as a component of a lean supply chain?

(Multiple Choice)
5.0/5
(86)

To develop a lean manufacturing system a firm might do which of the following?

(Multiple Choice)
4.9/5
(79)
Showing 21 - 40 of 85
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)