Exam 21: Material Requirements Planning
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
Which of the following is considered a secondary report in an MRP system?
(Multiple Choice)
4.9/5
(90)
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
(True/False)
4.8/5
(77)
In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
(True/False)
4.7/5
(81)
The time-phased plan specifying how many and when the firm plans to build each end item is called the materials requirements plan (MRP).
(True/False)
4.8/5
(77)
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding) each item in a product structure file and summing at all levels.
(True/False)
4.8/5
(65)
Low-level coding in MRP indicates the exact status of each item managed by the system in "real time."
(True/False)
4.8/5
(80)
In a net change MRP system, requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
(True/False)
4.8/5
(82)
This industry type includes industries such as foundries, rubber and plastics, specialty paper, chemicals, paint, drug, and food processors.
(Multiple Choice)
4.7/5
(85)
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000, inventory on hand is 1,200, and planned receipts are 800?
(Multiple Choice)
4.8/5
(75)
Which of the following is an input to the master production schedule?
(Multiple Choice)
4.9/5
(81)
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
(True/False)
4.8/5
(85)
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
(True/False)
4.8/5
(77)
An input to the material requirements planning (MRP) system is an inventory records file.
(True/False)
4.9/5
(80)
A super bill can specify that a fraction of a part, say 25 percent, is used.
(True/False)
4.9/5
(68)
The master production schedule states the number of items to be produced during specific time periods.
(True/False)
4.9/5
(79)
MRP is a logical, easily understandable approach to the problem of determining the number of parts, components, and materials needed to produce each end item.
(True/False)
4.9/5
(65)
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal?
(Multiple Choice)
5.0/5
(88)
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).