Exam 21: Material Requirements Planning
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
Which of the following is not a production activity report generated by MRP?
(Multiple Choice)
4.9/5
(82)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?
(Multiple Choice)
4.7/5
(72)
The least unit cost method of lot-sizing adds ordering, stock-out, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
(True/False)
4.9/5
(78)
A modular bill-of-materials includes items with fractional options.
(True/False)
5.0/5
(73)
In a net change MRP system, requirements and schedules are considered rigid and never updated.
(True/False)
4.9/5
(87)
In an MRP problem, A is an MPS item. Every A requires 2 B's and 3 C's. Every B requires 5 C's. All lead times are two periods. All initial inventory values are 0. Use lot-4-lot method for order quantities for all items. What is the low level code (LLC) for B and C?
(Multiple Choice)
4.9/5
(82)
Which of the following is not a lot-sizing technique used in MRP systems?
(Multiple Choice)
4.7/5
(84)
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
(True/False)
4.9/5
(74)
The three main inputs to an MRP system are the bill-of-materials, the master schedule, and the inventory records file.
(True/False)
4.9/5
(80)
Which of the following is an input to the master production schedule?
(Multiple Choice)
4.7/5
(76)
In this industry type, items are manufactured by machine to customer order. These are generally industrial orders.
(Multiple Choice)
4.8/5
(80)
Which of the following is considered a primary report in an MRP system?
(Multiple Choice)
4.8/5
(86)
The master production schedule deals exclusively with dependent demand items.
(True/False)
4.9/5
(79)
This industry type combines multiple component parts into a finished product, which is then stocked in inventory to satisfy customer demand.
(Multiple Choice)
4.9/5
(72)
Which of the following industry types have high expected benefits from the application of MRP?
(Multiple Choice)
4.7/5
(88)
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
(True/False)
4.8/5
(71)
Showing 61 - 80 of 91
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)