Which of the following is not a production activity report generated by MRP?

(Multiple Choice)
4.9/5
(82)

Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?

(Multiple Choice)
4.7/5
(72)

MRP is based on dependent demand.

(True/False)
4.9/5
(91)

The least unit cost method of lot-sizing adds ordering, stock-out, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.

(True/False)
4.9/5
(78)

A modular bill-of-materials includes items with fractional options.

(True/False)
5.0/5
(73)

In a net change MRP system, requirements and schedules are considered rigid and never updated.

(True/False)
4.9/5
(87)

In an MRP problem, A is an MPS item. Every A requires 2 B's and 3 C's. Every B requires 5 C's. All lead times are two periods. All initial inventory values are 0. Use lot-4-lot method for order quantities for all items. What is the low level code (LLC) for B and C?

(Multiple Choice)
4.9/5
(82)

MRP systems seek to achieve which of the following?

(Multiple Choice)
5.0/5
(89)

Which of the following is not a lot-sizing technique used in MRP systems?

(Multiple Choice)
4.7/5
(84)

MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.

(True/False)
4.9/5
(74)

The three main inputs to an MRP system are the bill-of-materials, the master schedule, and the inventory records file.

(True/False)
4.9/5
(80)

Which of the following is an input to the master production schedule?

(Multiple Choice)
4.7/5
(76)

A product tree can do which of the following?

(Multiple Choice)
4.9/5
(82)

In this industry type, items are manufactured by machine to customer order. These are generally industrial orders.

(Multiple Choice)
4.8/5
(80)

Which of the following is considered a primary report in an MRP system?

(Multiple Choice)
4.8/5
(86)

The master production schedule deals exclusively with dependent demand items.

(True/False)
4.9/5
(79)

A BOM file is also called which of the following?

(Multiple Choice)
4.8/5
(72)

This industry type combines multiple component parts into a finished product, which is then stocked in inventory to satisfy customer demand.

(Multiple Choice)
4.9/5
(72)

Which of the following industry types have high expected benefits from the application of MRP?

(Multiple Choice)
4.7/5
(88)

MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.

(True/False)
4.8/5
(71)