Exam 33: Residential Utility-Interactive Photovoltaic Systems
Exam 1: General Information for Electrical Installations18 Questions
Exam 2: Electrical Symbols and Outlets24 Questions
Exam 3: Determining the Required Number of Branch Circuits, Lighting Outlets, Receptacle Outlets26 Questions
Exam 4: Conductor Sizes and Types, Wiring Methods, Wire Connections, Voltage Drop, Neutral Conductor Sizing for Services39 Questions
Exam 5: Conductor Identification, Switch Control of Lighting Circuits, Bondinggrounding of Wiring Devices, Induction Heating31 Questions
Exam 6: Ground-Fault Circuit Interrupters, Arc-Fault Circuit Interrupters, Surge Protective Devices, Immersion Detection Circuit Interrupters, and Appliance Leakage Current Interrupters23 Questions
Exam 7: Luminaires, Ballasts, and Lamps33 Questions
Exam 8: Lighting Branch Circuit for the Front Bedroom22 Questions
Exam 9: Lighting Branch Circuit for the Master Bedroom20 Questions
Exam 10: Lighting Branch Circuitbathrooms, Hallway20 Questions
Exam 11: Lighting Branch Circuit-Front Entry, Porch, Post-Light, Underground Wiring13 Questions
Exam 12: Lighting Branch Circuit and Small-Appliance Circuits for the Kitchen20 Questions
Exam 13: Lighting Branch Circuit for the Living Room16 Questions
Exam 14: Lighting Branch Circuit for the Studybedroom7 Questions
Exam 15: Dryer Outlet, Lighting and Receptacle Circuits for the Laundry, Powder Room, Rear Entry Hall, and Attic19 Questions
Exam 16: Branch Circuits for the Garage and Outdoors20 Questions
Exam 17: Recreation Room14 Questions
Exam 18: Lighting Branch Circuit, Receptacle Circuits for Workshop21 Questions
Exam 19: Special-Purpose Outletswater Pump, Water Heater21 Questions
Exam 20: Special-Purpose Outlets for Ranges, Counter-Mounted Cooking Unit G, and Wall-Mounted Oven F24 Questions
Exam 21: Special-Purpose Outletsfood Waste Disposer, Dishwasher16 Questions
Exam 22: Special-Purpose Outlets for the Bathroom Ceiling Heatventlights K J, the Attic Fan L, and the Hydromassage Tub a18 Questions
Exam 23: Special-Purpose Outletselectric Heating, Air Conditioning27 Questions
Exam 24: Gas and Oil Central Heating Systems20 Questions
Exam 25: Television, Telephone, and Low-Voltage Signal Systems20 Questions
Exam 26: Smoke, Heat, and Carbon Monoxide Alarms, and Security Systems20 Questions
Exam 27: Service-Entrance Equipment20 Questions
Exam 28: Overcurrent Protectionfuses and Circuit Breakers20 Questions
Exam 29: Service-Entrance Calculations17 Questions
Exam 30: Swimming Pools, Spas, Hot Tubs, and Hydromassage Baths38 Questions
Exam 31: Wiring for the Future: Home Automation Systems20 Questions
Exam 32: Standby Power Systems15 Questions
Exam 33: Residential Utility-Interactive Photovoltaic Systems20 Questions
Select questions type
How are the sizes of PV system conductors and components determined?
Free
(Essay)
4.9/5
(68)
Correct Answer:
The sizes are determined by the amount of current that flows through them.
Inverter size is based on the ____ of the array.
Free
(Multiple Choice)
4.8/5
(77)
Correct Answer:
C
An inverter or ac module is required to automatically ____ its output when utility power is lost.
Free
(Multiple Choice)
4.8/5
(86)
Correct Answer:
A
A photovoltaic module is a manufactured unit made up of many semi-conductor PV cells encased in a protective covering and mounted to a(n) ____________________.
(Short Answer)
4.7/5
(79)
A combination of factors recently has made photovoltaic systems very popular including ____.
(Multiple Choice)
4.8/5
(85)
A single small inverter connected to each photovoltaic module is known as a ____-inverter.
(Multiple Choice)
5.0/5
(84)
What are buildings with stand-alone or utility-interactive PV systems required to have indicating the presence of the system and location(s) of disconnecting means?
(Essay)
4.8/5
(57)
A grounding electrode system is required for ____ photovoltaic systems.
(Multiple Choice)
4.9/5
(92)
Most residential PV systems are made up of ____ strings that can be combined in a single box.
(Multiple Choice)
4.8/5
(70)
Exposed single-conductor cable is permitted to be installed for array interconnection, and only types ____ and listed PV wire are permitted.
(Multiple Choice)
4.9/5
(79)
A connection on the ____________________ side of the main disconnect is known as a supply-side point of connection.
(Short Answer)
4.8/5
(84)
All photovoltaic modules are required by the NEC to be listed to nationally recognized standards.
(True/False)
4.8/5
(80)
According to 690.41, one conductor of a 2-wire PV system over ____________________ volts shall be grounded.
(Short Answer)
4.8/5
(96)
When determining the circuit size and current of a PV system, first use a multiplier to calculate the maximum source circuit current, then apply a second multiplier to determine the size of system conductors and ____________________.
(Short Answer)
4.8/5
(78)
A disconnect for the ungrounded dc string conductor(s) is never required before the conductors enter the dwelling.
(True/False)
4.9/5
(69)
A dedicated PV system circuit breaker, suitable for backfeed and positioned at the opposite end of the bus from the ____, is a requirement of NEC 705.12(B).
(Multiple Choice)
4.8/5
(84)
Photovoltaic modules that also serve as an outer protective finish for a building are known as structure-integrated photovoltaic (SIPV) modules.
(True/False)
4.9/5
(75)
NEC 690.7(C) limits photovoltaic source and output circuits to 600 volts or less for one- and two-family dwellings.
(True/False)
4.9/5
(85)
If circuit conductors for PV systems were sized using the requirements of 690.8(B) and there are no external sources of parallel currents that exceed the ampacity of the conductors, then overcurrent protection is required.
(True/False)
4.9/5
(87)