Exam 5: Strategic Capacity Management
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
When evaluating capacity, managers need to consider both resource inputs and product outputs.
(True/False)
4.7/5
(58)
The way to build in greater flexibility in your workers is to do which of the following?
(Multiple Choice)
4.9/5
(85)
A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate.
(True/False)
4.8/5
(88)
Three important issues to be considered when adding or decreasing capacity are number of workers, the skill of those workers, and how fast workers can be added or reduced.
(True/False)
4.7/5
(78)
The idea that as the plant gets larger and volume increases, the average cost per unit drops.
(Multiple Choice)
4.8/5
(71)
Long-range capacity planning requires top management participation.
(True/False)
4.8/5
(73)
Capacity flexibility means having the ability to rapidly increase or decrease production levels or to shift production capacity quickly from one product or service to another.
(True/False)
4.8/5
(63)
The objective of strategic capacity planning is to determine the overall capacity level of capital-intensive resources (including facilities, equipment, and overall labor force size) that best supports the company's short-range competitive strategy.
(True/False)
4.9/5
(72)
A decision tree problem does not need probabilities or payoffs to generate a solution.
(True/False)
4.9/5
(67)
With decision trees, squares represent chance events and circles represent decision points.
(True/False)
4.9/5
(85)
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?
(Multiple Choice)
4.8/5
(82)
Because services cannot be stored for later use, service managers consider time as one of their supplies or resources.
(True/False)
4.9/5
(73)
Best operating level is usually a multiple of the level of capacity for which a process was designed.
(True/False)
4.8/5
(92)
The capacity focus concept can be put into practice through a mechanism called which of the following?
(Multiple Choice)
4.8/5
(89)
In practice, achieving a perfectly balanced plant is usually both impossible and undesirable.
(True/False)
5.0/5
(82)
Capacity planning that involves hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is considered as which one of the following planning horizons?
(Multiple Choice)
4.8/5
(84)
In solving a decision tree problem, calculations start at the ends of the "branches" of the tree and work backward to the base of the tree.
(True/False)
4.9/5
(75)
Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.
(True/False)
4.7/5
(88)
In a decision tree, the only time probabilities are applied to a decision node is when the decision is being made by someone else such as your customer or your competitor.
(True/False)
4.8/5
(68)
Showing 21 - 40 of 69
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)