A hotel tracks the number of complaints per month. When the process is in control, there is an average of 35 complaints per month. Assume that a 2- sigma control limit is used. The next four months have 33, 27, 29, and 43 complaints. What should management do?

(Multiple Choice)
4.9/5
(86)

The central line on a p- chart is 0.50 with an UCL of 0.65 and a LCL of 0.35. The results of the next six samples are 0.60, 0.37, 0.45, 0.48, 0.53, and 0.62. What should you do?

(Multiple Choice)
4.7/5
(78)

Once a process is in statistical control, SPC techniques detect the onset of assignable causes of variation so that they can be eliminated.

(True/False)
4.7/5
(71)

A new product has been designed with three modules. Extensive testing of each module resulted in the following reliabilities: 0.999, 0.998, and 0.995. What is the reliability of the product?

(Multiple Choice)
4.9/5
(64)

______ costs result from defects that are discovered during the production of a product or service.

(Short Answer)
4.9/5
(87)

Continuous improvement is a philosophy that

(Multiple Choice)
4.9/5
(76)

A company is interested in monitoring the number of scratches on Plexiglas panels. The appropriate control chart to use would be A company is interested in monitoring the number of scratches on Plexiglas panels. The appropriate control chart to use would be

(Multiple Choice)
4.8/5
(78)

Working with suppliers to increase the quality of purchased items used to produce a product would be categorized as a prevention cost of quality.

(True/False)
5.0/5
(85)

For a high- technology product, the lifespan of the product before it begins to deteriorate or no longer functions at an acceptable level is considered the basic performance dimension of quality.

(True/False)
4.9/5
(91)

Historically, the average time to service a customer complaint has been 3 days and the standard deviation has been 0.50 day. Management would like to specify the control limits for an X- chart with a sample size of 10 and 3 sigma limits. Suppose the next sample of 10 yielded the following result: 3.2, 2.1, 3.6, 2.8, 3.9, 3.5, 2.7, 4.1, 2.6, and 3.3. What conclusion can be drawn?

(Multiple Choice)
4.8/5
(73)

The International Standard ISO 26000:2010 produced a guidance document for social responsibility.

(True/False)
4.8/5
(66)

Four samples of 100 each were taken from an assembly line, with the following results: Using the historical average as the central line of the chart, which one of the following is the limits for an attributes control chart with z = 2? Sample Number Number Defective 1 6 2 12 3 2

(Multiple Choice)
4.8/5
(67)

A hotel tracks the number of complaints per month. When the process is in control, there is an average of 35 complaints per month. Assume that a 2- sigma control limit is used. What is the lower control limit?

(Multiple Choice)
4.8/5
(79)

Process capability determines whether a process is capable of producing the product or services that customers demand.

(True/False)
4.9/5
(67)

Deming argued that 85% of quality problems could be directly attributed to employees based on mistakes made by not following the instructions of management.

(True/False)
4.9/5
(74)

Historically, the average proportion of defective bars has been 0.015. Samples will be of 100 bars each. Construct a p- chart using z = 3. Suppose a sample had 0.07 defective. What would you do?

(Multiple Choice)
4.7/5
(69)

What is the plan- do- check- act cycle? (also referred to as the Deming Wheel)

(Essay)
4.8/5
(65)

Historically, the average time to service a customer complaint has been 3 days and the standard deviation has been 0.50 day. Management would like to specify the control limits for an X- chart with a sample size of 10 and 3 sigma limits. The UCL for the chart would be ---

(Multiple Choice)
4.9/5
(75)

A company is interested in monitoring the variability in the weight of the fertilizer bags it produces. An appropriate control chart would be A company is interested in monitoring the variability in the weight of the fertilizer bags it produces. An appropriate control chart would be

(Multiple Choice)
4.9/5
(66)

Which one of the following is a consequence of internal failures?

(Multiple Choice)
4.9/5
(65)