Exam 7: Inventory Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Explain the distinction between variable and attribute measures of quality.

(Essay)
4.9/5
(81)

______ is a continuous, systematic procedure that measures a firm's products, services, and processes against those of industry leaders.

(Short Answer)
4.9/5
(78)

The implementation of a total quality management program will most likely result in a(n)

(Multiple Choice)
4.8/5
(72)

The manufacturing of compact disks requires four steps. The reliabilities of the steps are 0.80, 0.85, 0.95, and 0.90 respectively. What is the reliability of the process to produce a good compact disk?

(Multiple Choice)
4.8/5
(75)

A(n) ______ is a diagram that relates a key quality problem to its potential causes.

(Short Answer)
4.8/5
(58)

One of the principles that total quality management (TQM) stresses is customer satisfaction.

(True/False)
4.8/5
(70)

 Factors for Calculating Three- Sigma Limits for the Xˉ‾ - chart and R - chart \text { Factors for Calculating Three- Sigma Limits for the } \overline { \bar { X } } \text { - chart and } R \text { - chart } \text { Factors for Calculating Three- Sigma Limits for the } \overline { \bar { X } } \text { - chart and } R \text { - chart }     -Historically, the average diameter of the holes drilled has been 0.25 cm and the average range has been 0.1 cm. Determine the central line and upper and lower control limits for an  \bar { X } -  and an  R- chart, assuming samples of size 8 will be taken. Use Table 7.1. For the R- chart, what is the value of the LCL<sub>R</sub>? -Historically, the average diameter of the holes drilled has been 0.25 cm and the average range has been 0.1 cm. Determine the central line and upper and lower control limits for an Xˉ−\bar { X } - and an R- chart, assuming samples of size 8 will be taken. Use Table 7.1. For the R- chart, what is the value of the LCLR?

(Multiple Choice)
5.0/5
(80)

Which one of the following is NOT a characteristic of a process distribution?

(Multiple Choice)
4.7/5
(82)

"Conformance to specifications" implies that

(Multiple Choice)
4.8/5
(78)

Which alternative will increase the probability of detecting a shift in the process average?

(Multiple Choice)
4.8/5
(76)

______ philosophy was that quality is the responsibility of management.

(Short Answer)
4.9/5
(67)

Which of the following can be used to eliminate "common" causes of variation?

(Multiple Choice)
4.8/5
(90)

Table 7.1 Factors for Calculating Three- Sigma Limits for the - chart and R - chart Size of Sample (n) Factor for UCL and LCL for X-Charts Factor for LCL for R-Charts Factor for UCL for R - Charts (D)) 2 1.880 0 3.267 3 1.023 0 2.575 4 0.729 0 2.282 5 0.577 0 2.115 6 0.483 0 2.004 7 0.419 0.076 1.924 8 0.373 0.136 1.864 9 0.397 0.184 1.816 10 0.308 0.233 1.777 -Historically, the average diameter of the holes drilled has been 0.25 cm and the average range has been 0.1 cm. Determine the central line and upper and lower control limits for an X- and an  Table 7.1  \begin{array}{l} \text { Factors for Calculating Three- Sigma Limits for the } \bar { X } \text { - chart and } R \text { - chart }\\ \begin{array} { | c | l | l | l | }  \hline \begin{array} { l }  \text { Size of } \\ \text { Sample } \\ ( n ) \end{array} & \begin{array} { l }  \text { Factor for UCL } \\ \text { and LCL for } \\ \text { X-Charts } \\ \left( A _ { 2 } \right) \end{array} & \begin{array} { l }  \text { Factor for } \\ \text { LCL for } \\ \text { R-Charts } \\ \left( D _ { 2 } \right) \end{array} & \begin{array} { l }  \text { Factor for } \\ \text { UCL for } \\ R \text { - Charts } \\ ( D ) ) \end{array} \\ \hline 2 & 1.880 & 0 & 3.267 \\ 3 & 1.023 & 0 & 2.575 \\ 4 & 0.729 & 0 & 2.282 \\ 5 & 0.577 & 0 & 2.115 \\ 6 & 0.483 & 0 & 2.004 \\ 7 & 0.419 & 0.076 & 1.924 \\ 8 & 0.373 & 0.136 & 1.864 \\ 9 & 0.397 & 0.184 & 1.816 \\ 10 & 0.308 & 0.233 & 1.777 \\ \hline \end{array} \end{array}  -Historically, the average diameter of the holes drilled has been 0.25 cm and the average range has been 0.1 cm. Determine the central line and upper and lower control limits for an X- and an   R- chart, assuming samples of size 8 will be taken. Use Table 7.1.For the - chart, what is the value of  U C L \bar { _X } ? R- chart, assuming samples of size 8 will be taken. Use Table 7.1.For the - chart, what is the value of UCLXˉ?U C L \bar { _X } ?

(Multiple Choice)
4.9/5
(71)

In the plan- do- check- act cycle, the do refers to the team analyzing the data collected.

(True/False)
5.0/5
(75)

Continuous improvement is based on the Japanese concept called Kaizen.

(True/False)
4.9/5
(89)

ISO 9001:2008 standards

(Multiple Choice)
4.9/5
(92)

In applying quality control charts, a sample statistic that falls outside the UCL and LCL indicates the process is exhibiting common causes of variation.

(True/False)
4.9/5
(94)

______ believed that continuous improvement, hands- on management, and training are fundamental to achieving excellence in quality.

(Short Answer)
4.8/5
(75)

______ published a book titled Quality is Free which stressed the principle that the trade- off between tolerating versus preventing poor quality should always favour prevention and improvement.

(Short Answer)
4.8/5
(72)

A manager of a fiberglass molding operation suspects that the number of defects is related to the number of total units produced of a particular product. A tool most useful in this analysis would be a

(Multiple Choice)
4.9/5
(84)
Showing 181 - 200 of 218
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)