Exam 21: Material Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is considered a primary report in an MRP system?

(Multiple Choice)
4.9/5
(75)

In a typical inventory status record, which of the following would you not expect to see?

(Multiple Choice)
4.8/5
(73)

Which of the following is an input file necessary to run an MRP system?

(Multiple Choice)
4.7/5
(80)

In an MRP problem, A is an MPS item.Every A requires 2 B's and 3 C's.Every B requires 5 C's. All lead times are two periods.Initial inventory values for A is 100, B is 200 and C is 0.Use lot-4-lot method for order quantities for all items.If gross requirement for A is 800 in period 9, what will be the planned order release for B in period 5?

(Multiple Choice)
4.7/5
(86)

In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.

(True/False)
4.8/5
(68)

MRP is most valuable where a number of products are made in batches using the same productive equipment.

(True/False)
4.7/5
(70)

A lot-for-lot (L4L) lot-sizing technique does not take into account setup costs or capacity limitations.

(True/False)
4.7/5
(72)

If annual demand is 12,000 units, annual holding cost is $15 per unit, and setup cost per order is $25, which of the following is the EOQ lot size?

(Multiple Choice)
4.8/5
(85)

The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.

(True/False)
4.9/5
(82)

The three main inputs to an MRP system are the bill of materials, the master schedule, and the inventory records file.

(True/False)
5.0/5
(81)

In an MRP problem, A is an MPS item.Every A requires 2 B's and 3 C's.Every B requires 5 C's. All lead times are two periods.All initial inventory values are 0.Use lot-4-lot method for order quantities for all items.If gross requirement for A is 500 in period 8, what will be the planned order release for B in period 4?

(Multiple Choice)
4.9/5
(82)

Lot-for-lot (L4L) is the most common lot-sizing technique.

(True/False)
4.8/5
(89)

The lot-for-lot (L4L) lot-sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.

(True/False)
4.9/5
(81)

In a net change MRP system, requirements and schedules are updated whenever a transaction is processed that has an impact on the item.

(True/False)
4.9/5
(78)

In an MRP problem, A is an MPS item.Every A requires 3 B's and 2 C's.Every B requires 5 C's. All lead times are one period.Initial inventory values for all items are 0.Use lot-4-lot method for order quantities for all items.If gross requirement for A is 400 in period 10, what will be the planned order release for C in period 8?

(Multiple Choice)
4.8/5
(89)

Generally, determining lot sizes in MRP systems is simple.

(True/False)
4.9/5
(67)

Which of the following industry types will not benefit greatly from the application of MRP?

(Multiple Choice)
4.9/5
(76)

Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.

(True/False)
4.9/5
(76)

MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.

(True/False)
4.9/5
(85)

Which of the following is most closely related to the reason a firm might implement MRP?

(Multiple Choice)
4.9/5
(94)
Showing 41 - 60 of 83
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)