A kaizen burst is an overfilled kanban container.

Free
(True/False)
4.8/5
(70)
Correct Answer:
Verified

False

A kaizen burst is a symbol on a value stream map.

Free
(True/False)
4.8/5
(75)
Correct Answer:
Verified

True

In a Kanban card calculation problem, other things remaining the same (that is changing only one variable at a time) ,

Free
(Multiple Choice)
4.9/5
(83)
Correct Answer:
Verified

E

Lean production makes implementing green strategies in manufacturing processes more difficult.

(True/False)
4.8/5
(84)

One of the aims of value stream mapping to eliminate waste in a process.

(True/False)
4.8/5
(82)

To develop a lean manufacturing system a firm might do which of the following?

(Multiple Choice)
4.9/5
(77)

Group technology cells help to eliminate movement and queue (waiting) time between operations.

(True/False)
4.9/5
(82)

Preventive maintenance is emphasized in lean production to ensure that flows are not interrupted by downtime or malfunctioning equipment.

(True/False)
4.9/5
(82)

Firms in Japan tend to have short-term relationships with their suppliers and customers.

(True/False)
5.0/5
(80)

In setting up a Kanban control system you need to determine the number of kanban card sets needed.If assume the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?

(Multiple Choice)
4.7/5
(86)

A principle of value stream mapping is to concentrate on speeding up value-added operations.

(True/False)
5.0/5
(68)

Group technology (GT) is credited with which of the following benefits?

(Multiple Choice)
4.9/5
(81)

In implementing a lean production system, you should work with suppliers to do which of the following?

(Multiple Choice)
4.7/5
(87)

In implementing a lean production system you should work with suppliers to do which of the following?

(Multiple Choice)
4.9/5
(75)

Lean production is an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials, work-in-process, and finished goods.

(True/False)
4.8/5
(98)

You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25 percent of the demand during lead time.The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

(Multiple Choice)
4.8/5
(80)

In Japanese manufacturing, automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.

(True/False)
4.8/5
(85)

"Kanban squares" is an educational game played in kanban training sessions.

(True/False)
4.8/5
(81)

Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.

(True/False)
4.8/5
(75)

When implementing a lean production system, a stabilized schedule is achieved using which of the following?

(Multiple Choice)
4.9/5