Exam 14: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A kanban control system uses a signaling device to regulate JIT flows.

(True/False)
4.8/5
(78)

Which of the following is an element that addresses elimination of waste under lean production?

(Multiple Choice)
4.9/5
(85)

Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900s.

(True/False)
4.9/5
(75)

Uniform plant loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.

(True/False)
4.9/5
(76)

Automation is a key to lean procurement.

(True/False)
4.9/5
(77)

The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.

(True/False)
4.8/5
(82)

One of the many lean techniques that have been successfully applied in service firms is the upgrading of quality.

(True/False)
4.9/5
(73)

Respect for people is a key to Toyota's improvement ideas in manufacturing.

(True/False)
4.8/5
(83)

In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

(Multiple Choice)
4.9/5
(85)

Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.

(True/False)
4.9/5
(66)

JIT is typically applied to nonrepetitive manufacturing.

(True/False)
4.7/5
(70)

Which of the following address elimination of waste under lean production?

(Multiple Choice)
4.8/5
(75)

In designing a lean production facility layout, a designer should do which of the following?

(Multiple Choice)
4.8/5
(73)

Which of the following statements holds true for kanban production control systems?

(Multiple Choice)
4.8/5
(87)

One of the many lean techniques that have been successfully applied in service firms is leveling facility load.

(True/False)
4.9/5
(75)

Company unions in Japan exist to foster a cooperative relationship with management.

(True/False)
4.8/5
(70)

In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

(Multiple Choice)
4.9/5
(69)

You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25 percent of the demand during lead time.The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation.You found that the number of Kanban cards needed is 47.Your client now tells you that they miscalculated the demand and the true demand is 300 per hour.All other things remain the same.What is the most appropriate answer from the choices below?

(Multiple Choice)
4.9/5
(74)

Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?

(Multiple Choice)
4.8/5
(84)

One of the few lean techniques that does not work well in service firms is demand-pull scheduling.

(True/False)
4.8/5
(89)
Showing 41 - 60 of 71
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)