Exam 14: Lean Supply Chains
Exam 1: Introduction72 Questions
Exam 2: Strategy50 Questions
Exam 4: Project Management72 Questions
Exam 3: Design of Products and Services53 Questions
Exam 5: Strategic Capacity Management57 Questions
Exam 6: Learning Curves55 Questions
Exam 7: Manufacturing Processes41 Questions
Exam 8: Facility Layout55 Questions
Exam 9: Service Processes61 Questions
Exam 10: Waiting Line Analysis and Simulation70 Questions
Exam 11: Process Design and Analysis53 Questions
Exam 12: Six Sigma Quality69 Questions
Exam 13: Statistical Quality Control63 Questions
Exam 14: Lean Supply Chains71 Questions
Exam 15: Logistics Distribution, and Transportation55 Questions
Exam 16: Global Sourcing and Procurement66 Questions
Exam 17: Enterprise Resource Planning Systems45 Questions
Exam 18: Forecasting90 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management102 Questions
Exam 21: Material Requirements Planning83 Questions
Exam 22: Workcenter Scheduling61 Questions
Exam 23: Theory of Constraints55 Questions
Exam 24: Health Care60 Questions
Exam 25: Operations Consulting53 Questions
Select questions type
Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities.
(True/False)
4.9/5
(83)
In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?
(Multiple Choice)
4.8/5
(79)
Using the formula in the textbook, the only parameters we need to determine the number of kanban card sets is the average number of units demanded over some time period, the container size, and the safety stock.
(True/False)
4.7/5
(86)
"Quality at the source" requires factory workers to become their own inspectors.
(True/False)
4.8/5
(69)
Which of the following is a lean production technique that has been successfully applied in service firms?
(Multiple Choice)
4.7/5
(67)
To implement lean production schedules, a firm would do which of the following?
(Multiple Choice)
4.9/5
(67)
In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?
(Multiple Choice)
4.9/5
(75)
Subcontractor networks are not very important in Japanese manufacturing.
(True/False)
4.8/5
(87)
Consider the relationship between optimal lot size and set-up cost.Other things remaining the same, as the set-up cost decreases,
(Multiple Choice)
4.7/5
(76)
Lean production is a management philosophy and a pull system throughout the plant.
(True/False)
4.7/5
(81)
The goal of JIT production is to drive all inventory queues lower.
(True/False)
4.8/5
(63)
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?
(Multiple Choice)
4.8/5
(93)
In the textbook, the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.
(True/False)
4.9/5
(93)
One of the many lean techniques that have been successfully applied in service firms is the upgrading of housekeeping.
(True/False)
4.8/5
(85)
In a lean production system, we expect to see which of the following?
(Multiple Choice)
4.9/5
(90)
An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced is called which of the following?
(Multiple Choice)
4.8/5
(78)
You have been called in as a consultant to set up a kanban control system.The first thing you do is to determine the number of kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5 percent of the demand during lead time.The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours.Which of the following is the number of kanban card sets necessary to support this situation?
(Multiple Choice)
4.9/5
(74)
JIT production means that we produce the product before it is required so the customer does not wait for the product.
(True/False)
4.7/5
(68)
Showing 21 - 40 of 71
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)