Exam 14: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities.

(True/False)
4.9/5
(83)

In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?

(Multiple Choice)
4.8/5
(79)

Using the formula in the textbook, the only parameters we need to determine the number of kanban card sets is the average number of units demanded over some time period, the container size, and the safety stock.

(True/False)
4.7/5
(86)

"Quality at the source" requires factory workers to become their own inspectors.

(True/False)
4.8/5
(69)

Which of the following is a lean production technique that has been successfully applied in service firms?

(Multiple Choice)
4.7/5
(67)

To implement lean production schedules, a firm would do which of the following?

(Multiple Choice)
4.9/5
(67)

In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

(Multiple Choice)
4.9/5
(75)

Subcontractor networks are not very important in Japanese manufacturing.

(True/False)
4.8/5
(87)

Consider the relationship between optimal lot size and set-up cost.Other things remaining the same, as the set-up cost decreases,

(Multiple Choice)
4.7/5
(76)

Kanban means "symbol" or "box" in Japanese.

(True/False)
4.9/5
(80)

Which of the following are related to lean production?

(Multiple Choice)
4.9/5
(76)

Lean production is a management philosophy and a pull system throughout the plant.

(True/False)
4.7/5
(81)

The goal of JIT production is to drive all inventory queues lower.

(True/False)
4.8/5
(63)

Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?

(Multiple Choice)
4.8/5
(93)

In the textbook, the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.

(True/False)
4.9/5
(93)

One of the many lean techniques that have been successfully applied in service firms is the upgrading of housekeeping.

(True/False)
4.8/5
(85)

In a lean production system, we expect to see which of the following?

(Multiple Choice)
4.9/5
(90)

An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced is called which of the following?

(Multiple Choice)
4.8/5
(78)

You have been called in as a consultant to set up a kanban control system.The first thing you do is to determine the number of kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5 percent of the demand during lead time.The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours.Which of the following is the number of kanban card sets necessary to support this situation?

(Multiple Choice)
4.9/5
(74)

JIT production means that we produce the product before it is required so the customer does not wait for the product.

(True/False)
4.7/5
(68)
Showing 21 - 40 of 71
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)