Exam 21: Material Requirements Planning
Exam 1: Introduction72 Questions
Exam 2: Strategy50 Questions
Exam 4: Project Management72 Questions
Exam 3: Design of Products and Services53 Questions
Exam 5: Strategic Capacity Management57 Questions
Exam 6: Learning Curves55 Questions
Exam 7: Manufacturing Processes41 Questions
Exam 8: Facility Layout55 Questions
Exam 9: Service Processes61 Questions
Exam 10: Waiting Line Analysis and Simulation70 Questions
Exam 11: Process Design and Analysis53 Questions
Exam 12: Six Sigma Quality69 Questions
Exam 13: Statistical Quality Control63 Questions
Exam 14: Lean Supply Chains71 Questions
Exam 15: Logistics Distribution, and Transportation55 Questions
Exam 16: Global Sourcing and Procurement66 Questions
Exam 17: Enterprise Resource Planning Systems45 Questions
Exam 18: Forecasting90 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management102 Questions
Exam 21: Material Requirements Planning83 Questions
Exam 22: Workcenter Scheduling61 Questions
Exam 23: Theory of Constraints55 Questions
Exam 24: Health Care60 Questions
Exam 25: Operations Consulting53 Questions
Select questions type
Which of the following is considered a secondary report in an MRP system?
Free
(Multiple Choice)
4.8/5
(74)
Correct Answer:
B
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?
Free
(Multiple Choice)
4.9/5
(70)
Correct Answer:
C
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
Free
(True/False)
4.9/5
(89)
Correct Answer:
True
Which of the following can be used for lot sizing in an MRP system?
(Multiple Choice)
4.9/5
(79)
We would expect to see which of the following in an MRP system's inventory status file?
(Multiple Choice)
4.9/5
(101)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?
(Multiple Choice)
4.7/5
(92)
Which of the following is an input to the master production schedule?
(Multiple Choice)
4.9/5
(71)
An input to the material requirements planning (MRP) system is an exception report.
(True/False)
4.9/5
(72)
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
(True/False)
4.7/5
(85)
Net change MRP reflects the exact status of each item managed by the system in "real time."
(True/False)
4.8/5
(76)
A master production schedule is an input to a material requirements planning (MRP) system.
(True/False)
4.8/5
(73)
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot size in which these are most nearly equal?
(Multiple Choice)
4.8/5
(78)
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?
(Multiple Choice)
5.0/5
(88)
Which of the following is not a lot-sizing technique used in MRP systems?
(Multiple Choice)
4.9/5
(77)
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal?
(Multiple Choice)
4.8/5
(80)
Which of the following is a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost?
(Multiple Choice)
4.8/5
(87)
Which of the following industry types have high expected benefits from the application of MRP?
(Multiple Choice)
4.9/5
(77)
Which of the following is an input file necessary to run an MRP system?
(Multiple Choice)
4.8/5
(82)