Exam 3: Design of Products and Services

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Design for manufacturing and assembly delivers product improvements by emphasizing which of the following?

Free
(Multiple Choice)
4.9/5
(84)
Correct Answer:
Verified

B

Specialized design firms tend to have highly developed processes that support the needs of particular industries.

Free
(True/False)
5.0/5
(83)
Correct Answer:
Verified

True

A contract manufacturer is an organization capable of manufacturing and/or purchasing all of the components needed to produce a finished product or device.

Free
(True/False)
4.8/5
(83)
Correct Answer:
Verified

True

In the generic product development process, collecting customer needs is accomplished during phase 0 (planning).

(True/False)
4.8/5
(69)

Economic analysis of product development projects must evaluate which of the following?

(Multiple Choice)
4.9/5
(67)

The "house of quality" matrix is a technique that relates customer requirements to concrete operating or engineering goals.

(True/False)
4.7/5
(61)

Early prototypes of a new product, using the same geometry and material processes as the production versions, are usually constructed during the concept development phase of the product development process.

(True/False)
4.7/5
(71)

Which of the following is a time-to-market performance measure used in judging product development performance?

(Multiple Choice)
4.8/5
(83)

The generic development process outlined in the textbook is followed by many, if not most, of the firms in the Fortune 500.

(True/False)
4.9/5
(69)

Sensitivity analysis of the base-case financial model is a useful tool for which of the following reasons?

(Multiple Choice)
4.8/5
(72)

One of the methodologies that can aid in designing a new product for customers is a house of quality matrix.

(True/False)
4.9/5
(93)

One of the major benefits of DFMA is that products are designed that customers will want.

(True/False)
4.8/5
(84)

Target customers are specified during "Phase 0: Planning" of the generic product development process.

(True/False)
4.9/5
(77)

Which of the following is a characteristic of concurrent engineering?

(Multiple Choice)
4.9/5
(71)

Core competencies are those things that everyone in the firm must be able to do well.

(True/False)
4.9/5
(74)

What dimension of competitiveness does time-to-market performance in product design and process selection affect?

(Multiple Choice)
4.8/5
(76)

Most purchasers of electronic products cannot fully operate them and use only a small number of the available features.

(True/False)
4.7/5
(85)

Ecodesign replaces one or more of the other requirements considered in the design process.

(True/False)
4.8/5
(73)

Quality function deployment is an engineering analysis whose purpose is to simplify products and processes.

(True/False)
4.9/5
(77)

Advocates of financial modeling of product design projects argue that:

(Multiple Choice)
4.8/5
(71)
Showing 1 - 20 of 53
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)