Looking at the loads that are placed on each resource by the products that are scheduled through them is called process flow profiling.

(True/False)
4.9/5
(85)

For a high-volume type of manufacturing, which of the following is the typical production scheduling approach?

(Multiple Choice)
4.9/5
(87)

The effects of statistical variations in processing times in a dependent sequence will eventually cancel themselves out due to the law of averages.

(True/False)
4.8/5
(86)

The assignment method of job sequencing is a special case of the transportation method of linear programming.

(True/False)
4.9/5
(86)

Which of the following is not an objective of workcenter scheduling?

(Multiple Choice)
4.9/5
(72)

One of the principles of workcenter scheduling is that once started, a job should not be interrupted.

(True/False)
4.7/5
(72)

For a mid-volume type of manufacturing, which of the following is the typical production scheduling approach?

(Multiple Choice)
4.8/5
(83)

According to the theory of constraints, which of the following can be a CCR?

(Multiple Choice)
4.9/5
(74)

In this type of production, the typical scheduling approach is infinite, forward scheduling of jobs: usually labor-limited, but certain functions may be machine-limited (a heat-treating process or a precision machining center, for example); priorities determined by MRP due dates.

(Multiple Choice)
4.8/5
(75)

Using the random order or "whim" priority rule to sequence production jobs means that supervisors or operators select whichever job they feel like running.

(True/False)
4.9/5
(69)

Johnson's rule, a priority rule used in sequencing production jobs, is used only in production situations where we are dealing with one machine or one stage of production activity.

(True/False)
4.8/5
(63)

The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed.

(True/False)
4.9/5
(80)

Which of the following is not a way in which a workcenter can be organized?

(Multiple Choice)
4.8/5
(75)

Which of the following is a tool of shop-floor control?

(Multiple Choice)
4.8/5
(83)

Throughput is all production. That is, everything that makes it to finished goods.

(True/False)
4.9/5
(73)

Statistical fluctuation refers to the normal variation about a mean or average.

(True/False)
4.9/5
(70)

One of the principles of workcenter scheduling is to match workcenter input information to what the worker can actually do.

(True/False)
5.0/5
(82)

The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.

(True/False)
4.8/5
(78)

Assume you are sequencing jobs using Johnson's rule. A particular job requires 7 hours to assemble and then is followed by 8 hours in the painting department. Which of the following is where you would schedule this job?

(Multiple Choice)
5.0/5
(88)

According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?

(Multiple Choice)
4.9/5
(85)