Exam 17: Project Management
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
Consider the following work breakdown structure: Duration Estimate (Days) Start Finish Activity Node Node Optimistic Most Likely Pessimistic A 1 2 9 15 21 B 1 3 13 21 23 C 2 4 6 9 18 D 2 5 23 35 47 E 3 5 19 26 27 F 4 6 23 29 41 G 5 6 14 20 26 H 6 7 2 5 8 What are the estimated slack times (in weeks) for activities A-H?
(Short Answer)
4.8/5
(82)
Given this information about activity 3-4: ES = 10, EF = 15, LS = 16, and LF = 21, we can determine that the amount of slack associated with the activity is:
(Multiple Choice)
4.7/5
(81)
A popular tool for planning and scheduling simple projects, and for initial planning on more complex projects, is the:
(Multiple Choice)
4.9/5
(67)
A sequence of activities that leads from the starting node to the finishing node is called a:
(Multiple Choice)
4.7/5
(89)
The network diagram describes sequential relationships among major activities on a project.
(True/False)
4.8/5
(68)
In the project network presented below, numbers on each arrow refer to the expected time and standard deviation in weeks for that particular activity. For example, "8,2" indicates an activity with an expected time of 8 and a standard deviation of two weeks.
For this project, determine each of the following:
(A) the activities which are on the critical path
(B) the expected project duration
(C) the probability that the project will be completed in 29 weeks or less
(Essay)
4.8/5
(86)
A hierarchical listing of what must be done in a project is called a:
(Multiple Choice)
4.8/5
(74)
Consider the following work breakdown structure: Duration Estimate (Days) Start Finish Activity Node Node Optimistic Most Likely Pessimistic A 1 2 9 15 21 B 1 3 13 21 23 C 2 4 6 9 18 D 2 5 23 35 47 E 3 5 19 26 27 F 4 6 23 29 41 G 5 6 14 20 26 H 6 7 2 5 8 What is the probability that the critical path for this project will be completed within 75 weeks? 80 weeks? 85 weeks? 90 weeks?
(Short Answer)
4.9/5
(79)
Consider the following work breakdown structure: Time Estimates (wks) Start Finish Activity Node Node A 1 2 11 20 29 B 2 3 2 5 8 C 2 4 18 30 42 D 3 4 7 10 13 E 1 4 31 40 43 What is the probability that the critical path for this project will be completed within 52 weeks?
(Multiple Choice)
4.8/5
(69)
A project is represented by the following diagram:
The critical path for the network shown is:
(Multiple Choice)
4.8/5
(96)
If an activity is determined to be on the critical path, that means that it, and perhaps others, will affect project:
(Multiple Choice)
4.9/5
(80)
Consider the following work breakdown structure: Activity Precedes Normal Time (wks) Crashing Cost week week) Start A, B - - - A C, D 6 8 - B G 4 5 6 C E 4 - - D F 5 6 6 E H 6 8 8 F H 6 7 10 G I 8 3 5 H End 5 12 15 I End 6 5 - In crashing this project, which activity should be the first to be reduced?
(Short Answer)
4.8/5
(88)
The costs associated with risk events tend to be lower near the beginning of a project and higher near the end of the project.
(True/False)
4.9/5
(78)
An advantage of Gantt charts in project management is that they identify which activities can be delayed without delaying the overall project.
(True/False)
4.7/5
(89)
Consider the following work breakdown structure: Time Estimates (wks) Start Finish Activity Node Node A 1 2 11 20 29 B 2 3 2 5 8 C 2 4 18 30 42 D 3 4 7 10 13 E 1 4 31 40 43 What is the estimated expected (mean) time for activity E?
(Multiple Choice)
4.9/5
(72)
In project network analysis, "slack" refers to the difference between:
(Multiple Choice)
4.9/5
(74)
Path probabilities are calculated by dividing path mean by path standard deviations.
(True/False)
4.9/5
(74)
Showing 61 - 80 of 137
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)