Exam 14: Extension: Maintenance
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
In the area of maintenance, the Pareto phenomenon is reflected in the fact that, regardless of problem classification, all equipment will justify about the same expense.
Free
(True/False)
4.8/5
(94)
Correct Answer:
False
Suppose that the average time before breakdown is normally distributed with a mean of 2.5 weeks and a standard deviation of .4 weeks. If breakdowns cost an average of $1,200 and preventive maintenance costs $800, what is the optimal maintenance interval?
Free
(Multiple Choice)
4.7/5
(83)
Correct Answer:
C
As a piece of equipment begins to break down more often, the manager is often faced with a trade-off in which __________ are weighed against the __________.
Free
(Multiple Choice)
4.9/5
(77)
Correct Answer:
D
Suppose that for a particular piece of machinery, the frequency distribution of monthly breakdowns is as follows: Number of Breakdowns Prob. 0 0.50 1 0.25 2 0.10 3 0.10 4 0.05 The cost of a breakdown is $2,000, and the cost of a preventive maintenance program is $2,000 per month. If the preventive maintenance program is adopted, the probability of a machine breakdown is negligible. How much better off per month would the firm be if it adopted preventive maintenance?
(Multiple Choice)
4.8/5
(74)
___________ is most closely associated with breakdown maintenance.
(Multiple Choice)
4.9/5
(82)
The average time before breakdown of a machine is normally distributed and has a mean of nine weeks and a standard deviation of 1.5 weeks. If breakdown cost averages $1,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?
(Multiple Choice)
4.9/5
(83)
The total maintenance curve (preventive maintenance cost plus breakdown and repair cost):
(Multiple Choice)
4.8/5
(88)
One basis for scheduling preventive maintenance is passage of time.
(True/False)
4.8/5
(89)
In the broadest sense, preventive maintenance extends back to the installation stage of equipment and facilities.
(True/False)
4.8/5
(79)
Breakdown maintenance includes activities such as equipment inspection and adjustment.
(True/False)
4.9/5
(78)
The major approaches used in plans to deal with breakdowns include all of the following except:
(Multiple Choice)
4.9/5
(70)
Degree of technology is a factor affecting the decision of how much preventive maintenance is desirable.
(True/False)
4.9/5
(77)
The goal of maintenance is to maintain the productive system in good working order while minimizing or eliminating the cost of preventive maintenance.
(True/False)
5.0/5
(81)
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following except:
(Multiple Choice)
4.9/5
(68)
The frequency of breakdown of a piece of equipment per month is shown in the following table. The cost of a breakdown is $1,000, and the cost of preventive maintenance is $2,000 per month. Assume that the equipment breakdown can be avoided if preventive maintenance is performed. Should the manager use preventive maintenance, or would it be better to fix the equipment when it breaks down?
Number of breakdowns 0 1 2 3 4 5 Probability 0.10 0.15 0.20 0.30 0.15 0.10
[COMP: Delete zeros before decimals in table.]
(Essay)
4.9/5
(76)
Breakdown maintenance is best performed on a regularly scheduled basis.
(True/False)
4.9/5
(81)
Which of the following is the primary consideration with regard to preventive maintenance?
(Multiple Choice)
4.8/5
(82)
In the area of maintenance, the Pareto phenomenon is reflected in the fact that:
(Multiple Choice)
5.0/5
(72)
Showing 1 - 20 of 38
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)