Exam 12: MRP and ERP

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

ERP began in manufacturing organizations but has spread into service organizations.

Free
(True/False)
4.7/5
(86)
Correct Answer:
Verified

True

An assembly-time chart indicates gross and net requirements taking into account the current available inventory.

Free
(True/False)
4.9/5
(72)
Correct Answer:
Verified

False

MRP II did not replace or improve the basic MRP.

Free
(True/False)
5.0/5
(70)
Correct Answer:
Verified

True

Given the following information, develop a material requirements plan that will lead to 400 units of product P being available at the beginning of week 7. Given the following information, develop a material requirements plan that will lead to 400 units of product P being available at the beginning of week 7.

(Essay)
4.9/5
(95)

Which of the following is absolutely necessary for successful implementation and operation of MRP? (I) accurate inventory records (II) accurate demand forecasts (III) accurate holding and backordering costs (IV) accurate bills of materials

(Multiple Choice)
4.9/5
(73)

Safety time is sometimes used in MRP rather than safety stock quantities.

(True/False)
4.9/5
(71)

One reason that accurate bills of material are important is that errors at one level become magnified at lower levels because of the multiplication process used by MRP.

(True/False)
4.9/5
(78)

ERP's primary value comes from applications:

(Multiple Choice)
4.8/5
(89)

An MRP system whose records are updated continuously is referred to as a(n):

(Multiple Choice)
4.9/5
(89)

Project management approaches can help in a conversion to an ERP system.

(True/False)
4.7/5
(80)

An MRP system that is updated periodically to account for all changes which have occurred within a given time interval is called a(n) ________ system.

(Multiple Choice)
5.0/5
(82)

Which of these products would be most likely to have dependent demand?

(Multiple Choice)
5.0/5
(76)

Which of the following is a direct input into capacity requirements planning? (I) the master production schedule (II) routing information (III) current shop loads (IV) planned-order releases

(Multiple Choice)
4.8/5
(85)

Lot-for-lot ordering in MRP provides coverage for some predetermined number of periods (such as two or three) that extend beyond the orders already received for those periods.

(True/False)
4.9/5
(83)

The master schedule needs to be for a period long enough to cover the stacked or cumulative lead time necessary to produce the end items.

(True/False)
4.8/5
(82)

An effort to expand the scope of production resource planning by involving other functional areas in the planning process has been:

(Multiple Choice)
4.8/5
(88)

Which statement concerning MRP II is false?

(Multiple Choice)
4.7/5
(80)

The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of material.

(True/False)
4.8/5
(80)

In many organizations, information flows much more freely within functions than it does across functions. __________ represents an expanded effort to overcome this tendency.

(Multiple Choice)
5.0/5
(73)

Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand: Deluxe Easter Basket BOM Lead Time On-Hand Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50 Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. How many dark chocolate eggs should be ordered?

(Multiple Choice)
4.9/5
(78)