Exam 12: MRP and ERP
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
MRP II is simply an improved version of MRP that processes more quickly and can plan for a larger number of end items.
(True/False)
4.8/5
(89)
Lumpy demand for components results primarily from the periodic scheduling of batch production.
(True/False)
4.8/5
(70)
A bill of materials contains a listing of all the assemblies, parts, and materials needed to produce one unit of an end item.
(True/False)
4.9/5
(77)
In MRP, EOQ models tend to be less useful for materials at the lowest levels than for upper-level assemblies of the bill of materials since higher-level assemblies have larger dollar investments.
(True/False)
4.8/5
(80)
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand: Deluxe Easter Basket BOM Lead Time On-Hand Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50 Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. If the firm is using a fixed-period lot size of two periods, what is the order size for the first order?
(Multiple Choice)
4.9/5
(87)
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand: Deluxe Easter Basket BOM Lead Time On-Hand Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50 Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. What is the net requirement for dark chocolate truffles to fill this order?
(Multiple Choice)
5.0/5
(74)
End item Alpha's product structure tree and inventory information are as follows:
(A) If 50 units of Alpha are to be assembled, how many additional units of S will be needed? All parts can be ordered using lot-for-lot ordering, except M, which must be ordered in multiples of 40 units. [Hint: You don't need to do an MRP plan.]
(B) An order for 100 units of Alpha is scheduled to be shipped at the start of week 9. When is the earliest that any particular component must be started so that the order for Alpha will be ready to ship? [Hint: You don't need to do an MRP plan.]
(Essay)
4.9/5
(85)
Net requirements for component J are as follows: 60 units in week 2, 40 units in week 3, and 60 units in week 5. If a fixed-period, three-period lot-sizing method is used, what will be the quantity of the first planned receipt?
(Multiple Choice)
4.9/5
(76)
The MRP input listing the assemblies, subassemblies, parts, and raw materials needed to produce one unit of finished product is the:
(Multiple Choice)
4.9/5
(83)
In MRP, under lot-for-lot ordering, planned-order receipts are:
(Multiple Choice)
4.8/5
(78)
The gross requirements value for any given component is equal to the net requirements of that component's immediate parent multiplied by the quantity per parent.
(True/False)
4.9/5
(75)
MRP output reports are divided into two main groups, daily and weekly.
(True/False)
4.8/5
(81)
Refer to this product tree:
If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?
(Multiple Choice)
4.8/5
(76)
The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the:
(Multiple Choice)
4.8/5
(71)
The multiplication process used by MRP to determine lower-level requirements is called:
(Multiple Choice)
4.9/5
(77)
MRP can apply to services, especially when it is focused on:
(I) work-in-process inventory.
(II) finished goods inventory.
(III) service components.
(IV) materials that are part of the service process.
(Multiple Choice)
4.9/5
(86)
Showing 21 - 40 of 89
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)