The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: Job Processing Due Time (hrs) (hrs from now) 4 4 3 5 2 2 1 1 If he uses the shortest processing time first priority rule to schedule these jobs, what will be the average completion time?

(Multiple Choice)
4.8/5
(82)

Scheduling pertains to:

(Multiple Choice)
4.8/5
(72)

Priority rules generally assume that job setup cost is independent of processing sequence of jobs.

(True/False)
4.9/5
(94)

There are four resources and four jobs to be done. The time required for each resource to do each job is as follows: Job (Hours) Resource 1 5 8 7 7 2 4 9 5 9 3 6 9 8 7 4 7 6 6 9 After the row reduction, what is the reduced time for assigning resource 4 to Job D?

(Multiple Choice)
4.7/5
(85)

There are three jobs to be done and three resources with which to do them. Each resource will cost a specific amount to do each job, as shown in the following table: Machine Job A B C 1 \ 6 9 4 2 4 4 3 3 8 7 4 Can an optimum assignment be made after the first modification of the row and column reductions table?

(Short Answer)
4.9/5
(88)

In theory of constraints scheduling, the synchronization of the sequence of operations is referred to as the:

(Multiple Choice)
4.9/5
(87)

The priority rule which will sequence jobs in the order they are received is:

(Multiple Choice)
4.9/5
(90)

A scheduling rule used for sequencing jobs through two work centers is:

(Multiple Choice)
4.9/5
(83)

Given the following information concerning jobs awaiting processing at a single work center, what processing sequence will result if the critical ratio rule is used? Job Process Time At This Operation (hrs) Process Time At Remaining Operations (hrs) Final Due Date (hrs) G 4 4 9 H 8 6 38 I 6 10 24 J 3 8 20 L 5 14 32

(Essay)
4.8/5
(86)

The elimination of idle time on both bottleneck and non-bottleneck operations must be accomplished to optimize output.

(True/False)
4.8/5
(76)

Scheduled due dates are the result of:

(Multiple Choice)
4.8/5
(68)

The quantity sent to a bottleneck operation could be split into two or more process batches to better utilize a bottleneck resource rather than process the entire batch.

(True/False)
4.7/5
(77)

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the idle time at the paint work center for the optimal schedule?

(Multiple Choice)
4.9/5
(83)

Effective scheduling cannot:

(Multiple Choice)
4.9/5
(78)

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

(Multiple Choice)
4.9/5
(84)

There are three jobs to be done and three resources with which to do them. Each resource will take a specific time to do each job, as shown in the following table: Machine Job A B C 1 6 9 4 2 4 4 3 3 8 7 4 What is the result of the row reduction?

(Essay)
4.9/5
(79)

Primary considerations in scheduling high-volume systems involve: (I) coordinating the flow of inputs. (II) overcoming the disruptions to planned outputs. (III) assigning workers to work centers.

(Multiple Choice)
4.9/5
(74)

Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A, then by machine B: Process Time (Hours) Job Center A Center B 4 5 6 6 1 2 5 2 What is the idle time at machine B for the optimum schedule?

(Short Answer)
4.7/5
(90)

As long as the bottleneck operations are used effectively, idle time in non-bottleneck operations will not affect the overall productivity of the system.

(True/False)
4.9/5
(78)

The following table contains information about five jobs waiting to be processed at work center number three. Job Processing Time (hrs) Hours Until Due 14 15 10 20 18 18 2 16 4 21 Using the EDD rule, the sequence of jobs would be:

(Multiple Choice)
4.8/5
(73)