Exam 16: Scheduling

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival): Job Processing Time ( days ) Due Date (days from now) 2 2 5 6 6 10 3 4 4 8 If jobs A, B, and C require two operations each, while jobs D and E require one operation each, what is the schedule sequence using the slack per operation (S/O) priority rule?

(Short Answer)
4.7/5
(76)

A schedule chart can be used to monitor job progress.

(True/False)
4.8/5
(76)

The following matrix shows relative costs for various job-machine combinations. Which set of pairs constitutes the minimum-cost solution using the assignment method? Machine A B C Job 1 \ 6 0 0 2 0 3 4 3 0 1 2

(Multiple Choice)
4.8/5
(74)

There are four resources and four jobs to be done. The time required for each resource to do each job is as follows: Job (Hours) Resource 1 5 8 7 7 2 4 9 5 9 3 6 9 8 7 4 7 6 6 9 After the row and column reductions, what is the reduced time for assigning resource 4 to job D?

(Multiple Choice)
4.9/5
(69)

A major difference between manufacturing and service systems in terms of scheduling is:

(Multiple Choice)
4.7/5
(97)

When orders exceed our capacity, priority rules are used to select which orders will be accepted.

(True/False)
4.8/5
(76)

The term loading, as used in scheduling, refers to choosing the order in which jobs will be processed in low-volume systems.

(True/False)
4.7/5
(79)

For the jobs listed below, which processing sequence would result using Johnson's rule? Processing time (hrs) Job Center 1 Center 2 a 6 11 b 12 8 c 5 9 d 10 7

(Multiple Choice)
4.8/5
(91)

Which of the following is least likely to be a consideration when scheduling a high-volume system?

(Multiple Choice)
4.7/5
(71)

The theory of constraints has a goal of maximizing flow through the entire system.

(True/False)
4.8/5
(75)

One disadvantage of appointment systems is:

(Multiple Choice)
4.8/5
(72)

Job X, which has a duration of four days, is due by the close of business on Friday, December 23. Without looking at the work already at X's required resource, the scheduler schedules X to be begun immediately and assumes that X will be done four days from now. This is an example of:

(Multiple Choice)
4.7/5
(76)

Similar to that in manufacturing, the service scheduling hierarchy begins with __________ and ends with _________.

(Multiple Choice)
4.8/5
(75)

Bottlenecks may shift with the passage of time, so that different operations become bottleneck operations at different times.

(True/False)
4.9/5
(61)

The output of the system cannot exceed the output of the bottleneck operation(s).

(True/False)
4.9/5
(73)

Using the information in the table, determine the following: (A) Processing sequence using (1) SPT and (2) EDD rules (B) Average completion time and average job tardiness under each rule Job Processing Time (days) Day Due A 4 11 B 6 5 C 3 1 D 2 8 E 5 7

(Essay)
4.7/5
(75)

There are three jobs to be done and three resources with which to do them. Each resource will cost a specific amount to do each job, as shown in the following table: Machine Job A B C 1 6 9 4 2 4 4 3 3 8 7 4 What is the result of modifying the row and column reductions table?

(Essay)
4.7/5
(80)

The purpose of cyclical scheduling is to:

(Multiple Choice)
4.7/5
(86)

Input/output (I/O) control refers to monitoring the productivity changes since productivity is determined by the ratio of output to input.

(True/False)
4.8/5
(70)

A scheduling technique used to achieve an optimum, one-to-one matching of tasks and resources is:

(Multiple Choice)
4.9/5
(64)
Showing 81 - 100 of 134