Loading is the determination of which work centers should perform which jobs.

(True/False)
4.8/5
(75)

When operations are often bottlenecked, additional planned idle time will improve the throughput in those areas.

(True/False)
4.8/5
(70)

Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A, then by machine B: Process Time (Hours) Job Center A Center B 4 5 6 6 1 2 5 2 When does idle time occur at machine B for the optimum schedule?

(Essay)
4.8/5
(78)

In theory of constraints scheduling, the __________ refers to the schedule and the __________ refers to inventory used to ensure that the bottleneck is never idle.

(Multiple Choice)
4.9/5
(69)

Which of the following is not usually a characteristic of successful high-volume systems?

(Multiple Choice)
4.9/5
(71)

Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A, then by machine B: Process Time (Hours) Job Center A Center B 4 5 6 6 1 2 5 2 In developing the sequence which will minimize throughput time, what is the initial job to be placed in the schedule sequence?

(Short Answer)
4.8/5
(78)

The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: Job Processing Due Time (hrs) (hrs from now) 4 4 3 5 2 2 1 1 If he uses the shortest processing time first priority rule to schedule these jobs, what will be the average number of jobs in his shop today?

(Multiple Choice)
4.9/5
(71)

The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: Project (Hours) Consultant A B C D Charlie 13 16 11 13 Betty 11 15 14 18 Johnny 15 22 12 15 Rick 17 17 12 22 In how many different ways can she assign these consultants to these projects?

(Multiple Choice)
4.8/5
(86)

Based on the cost information given in the following table, which set of job-machine pairs reflects the minimum-cost solution using the Assignment method? Machine A B C Job 1 \ 6 0 0 2 3 6 4 3 2 4 0

(Multiple Choice)
4.7/5
(78)

There are four resources and four jobs to be done. The time required for each resource to do each job is as follows: Job (Hours) Resource 1 5 8 7 7 2 4 9 5 9 3 6 9 8 7 4 7 6 6 9 What is the optimal assignment of resources to jobs?

(Multiple Choice)
4.9/5
(64)

Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival): Job Processing Time ( days ) Due Date (days from now) 2 2 5 6 6 10 3 4 4 8 What is the schedule sequence using the earliest due date priority rule?

(Short Answer)
4.8/5
(63)

A Gantt chart is a basic scheduling tool that works best for high-volume systems.

(True/False)
4.9/5
(83)

There are three jobs to be done and three resources with which to do them. Each resource will take a specific time to do each job, as shown in the following table: Machine Job A B C 1 6 9 4 2 4 4 3 3 8 7 4 Can an optimum assignment be made after the row and column reductions?

(Short Answer)
4.7/5
(79)

Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival): Job Processing Time ( days ) Due Date (days from now) 2 2 5 6 6 10 3 4 4 8 What is the schedule sequence using the first come, first served priority rule?

(Short Answer)
4.8/5
(79)

The SPT priority rule always results in the lowest average completion time.

(True/False)
4.7/5
(78)

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the throughput time for the optimal schedule?

(Multiple Choice)
4.8/5
(81)

Job X arrived at work center Q at noon. At 2 p.m. that same day X was begun. X left work center Q at 3:15 p.m. that same day. X's flow time, in minutes, was:

(Multiple Choice)
4.8/5
(79)

Which sequencing rule is designed specifically to minimize job tardiness?

(Multiple Choice)
4.9/5
(85)

Using the cost information given in the following table, assign work crews to jobs so that total cost is minimized. Job Crew 1 \ 8 7 4 2 9 6 9 3 12 5 8

(Essay)
4.9/5
(82)

Which of the following is not a measure for judging the effectiveness of a schedule sequence?

(Multiple Choice)
4.8/5
(83)