Which of the following is not a step in developing a manufacturing cell layout?

(Multiple Choice)
4.8/5
(98)

The closer the customer is to the customer order decoupling point, the longer it takes the customer to receive the product.

(True/False)
4.9/5
(73)

The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.

(True/False)
5.0/5
(71)

Which of the following basic types of process structures is one in which equipment or work processes are arranged according to the progressive steps by which the product is made?

(Multiple Choice)
4.9/5
(76)

The closer the customer is to the customer order decoupling point, the more quickly the customer receives the product.

(True/False)
4.9/5
(97)

The placement of which of the following is not determined by production process organization decisions?

(Multiple Choice)
4.8/5
(75)

You are hired as a consultant to decide if your client should purchase a new, highly specialized piece of equipment.The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15, and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?

(Multiple Choice)
4.8/5
(70)

The term "assembly line" refers to progressive assembly linked by some material handling device.

(True/False)
4.9/5
(68)

In a work center, machine A has a 10-minute set-up time per batch and a 2-minute per unit run time.Machine B performs the identical function but has a set-up time of 30 minutes and a 1-minute run time per unit.The work center makes products in batches ranging from 1 unit to 100 units.Assuming capacity is not a limitation on either machine, in order to minimize the total processing time, on which batches should machine B be used?

(Multiple Choice)
4.9/5
(76)

Engineer-to-order firms will work with the customer to design the product and then make it from purchased materials, parts, and components.

(True/False)
4.9/5
(82)

In studying product-process matrix describing layout strategies, which of the following is most appropriate?

(Multiple Choice)
4.8/5
(84)

A general-purpose machine is less capable than a special-purpose machine in certain tasks but can perform a broader variety of tasks.

(True/False)
4.8/5
(83)

Assemble-to-order means moving the customer order decoupling point from finished goods to components.

(True/False)
4.9/5
(70)

A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.

(True/False)
4.8/5
(82)

A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.

(True/False)
4.7/5
(72)

In studying positioning of inventory in supply chains, which, if any, of the following is most appropriate?

(Multiple Choice)
4.8/5
(75)

Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.

(True/False)
4.8/5
(90)

Break-even analysis can only be used in production equipment decision making when dealing solely with fixed costs, not variable costs.

(True/False)
4.9/5
(65)

Suppose that you have two processes A and B for producing a widget.Process A has a fixed cost of $10,000 and per unit variable cost of $80.00.Process B has a fixed cost of $30,000 and the per unit variable cost is $40.00.The widget sells for $100 regardless of production process used.During the next three years (your planning horizon for the widgets) you expect the economy to be pretty good with sales of widgets to be at least 700 units per year.You will

(Multiple Choice)
4.9/5
(77)

One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.

(True/False)
4.7/5
(85)