Exam 38: Installation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Before a system is evacuated, all piping should be filled with nitrogen and a small amount of refrigerant, in order to be ___________________ checked.

(Short Answer)
4.7/5
(84)

Once the power has been connected to the condensing unit of a package air conditioner, it is a good idea to start the compressor immediately to make certain it runs.

(True/False)
4.9/5
(79)

A good way to fasten acoustical lining to the inside of sheet metal duct is to use ____.

(Multiple Choice)
4.8/5
(80)

What two fasteners are used with sheet metal square and rectangular duct?

(Multiple Choice)
4.8/5
(86)

A fitting used to change the size of a square or rectangular duct is called a(n) ____________________.

(Short Answer)
4.9/5
(81)

How much does sunshine affect the operation of a condensing unit?

(Short Answer)
4.8/5
(92)

A round to rectangular fitting is called a(n) ____________________.

(Short Answer)
4.9/5
(76)

Even though the cooling wire runs from the thermostat to the air handler, it actually just continues on to the condensing unit. Why isn't the cooling wire run directly from the thermostat to the condensing unit?

(Essay)
4.9/5
(75)

A boot in a duct system is a fitting used ____.

(Multiple Choice)
4.9/5
(89)

One purpose of a flexible duct connector in a duct system is to reduce the transmission of noise and vibration.

(True/False)
4.8/5
(81)

Explain service accessibility.

(Essay)
4.9/5
(78)

Power to the control transformer is controlled by the conditioned area thermostat.

(True/False)
4.9/5
(78)
Showing 21 - 32 of 32
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)