Exam 38: Installation
Exam 1: Heat and Pressure45 Questions
Exam 2: Matter and Energy32 Questions
Exam 3: Refrigeration and Refrigerants38 Questions
Exam 4: General Safety Practices31 Questions
Exam 5: Tools and Equipment30 Questions
Exam 6: Fasteners32 Questions
Exam 7: Tubing and Piping45 Questions
Exam 8: Leak Detection, System Evacuation and System Clean-Up33 Questions
Exam 9: Refrigerant and Oil Chemistry and Managementrecovery, Recycling, Reclaiming, and Retrofitting39 Questions
Exam 10: System Charging27 Questions
Exam 11: Calibrating Instruments34 Questions
Exam 12: Basic Electricity and Magnetism46 Questions
Exam 13: Introduction to Automatic Controls30 Questions
Exam 14: Automatic Control Components and Applications34 Questions
Exam 15: Troubleshooting Basic Controls33 Questions
Exam 16: Advanced Automatic Controlsdirect Digital Controls Ddc and Pneumatics35 Questions
Exam 17: Types of Electric Motors36 Questions
Exam 18: Application of Motors33 Questions
Exam 19: Motor Controls31 Questions
Exam 20: Troubleshooting Electric Motors30 Questions
Exam 21: Evaporators and the Refrigeration System37 Questions
Exam 22: Condensers35 Questions
Exam 23: Compressors35 Questions
Exam 24: Expansion Devices29 Questions
Exam 25: Special Refrigeration System Components35 Questions
Exam 26: Application of Refrigeration Systems34 Questions
Exam 27: Commercial Ice Machines35 Questions
Exam 28: Special Refrigeration Applications27 Questions
Exam 29: Troubleshooting and Typical Operating Conditions for Commercial Refrigeration34 Questions
Exam 30: Electric Heat29 Questions
Exam 31: Gas Heat27 Questions
Exam 32: Oil Heat35 Questions
Exam 33: Hydronic Heat35 Questions
Exam 34: Indoor Air Quality35 Questions
Exam 35: Comfort and Psychrometrics35 Questions
Exam 36: Refrigeration Applied to Air Conditioning31 Questions
Exam 37: Air Distribution and Balance35 Questions
Exam 38: Installation32 Questions
Exam 39: Residential Energy Auditing35 Questions
Exam 40: Typical Operating Conditions25 Questions
Exam 41: Troubleshooting28 Questions
Exam 42: Heat Gain and Heat Loss in Buildings35 Questions
Exam 43: Air Source Heat Pumps35 Questions
Exam 44: Geothermal Heat Pumps31 Questions
Exam 45: Domestic Refrigerators and Freezers35 Questions
Exam 46: Room Air Conditioners34 Questions
Exam 47: High-Pressure, Low-Pressure, and Absorption Chilled-Water Systems35 Questions
Exam 48: Cooling Towers and Pumps30 Questions
Exam 49: Operation, Maintenance, and Troubleshooting of Chilled-Water Air Conditioning Systems28 Questions
Exam 50: Commercial Rooftop, Packaged, Variable Refrigerant Flow, and Variable Air Volume Systems35 Questions
Select questions type
Application of acoustical lining to the interior of a duct is accomplished by using tabs, glue, or both.
Free
(True/False)
4.9/5
(71)
Correct Answer:
True
What materials are normally used in air-conditioning duct systems?
Free
(Essay)
4.9/5
(61)
Correct Answer:
(1) All-metal square or rectangular duct, (2) all-metal round duct, (3) fiberglass ductboard, and (4) flexible duct.
The line voltage for a system is normally installed by whom?
Free
(Short Answer)
4.8/5
(82)
Correct Answer:
A licensed electrical technician.
When the length of quick-connect precharged line sets is altered, the charge will not normally have to be altered.
(True/False)
4.8/5
(66)
A split central air-conditioning system is installed with the control transformer located in the attic-hung air handler and the condensing unit located outside. The low voltage wire from the thermostat is run to the ____________________.
(Short Answer)
4.9/5
(88)
____ used at the end of a metal duct run will help reduce any noise that may be traveling through the duct.
(Multiple Choice)
5.0/5
(72)
When hanging a horizontal air handler, it should be pitched toward the drain port for proper condensate removal.
(True/False)
4.8/5
(75)
When installing a split air-conditioning system with a remote condensing unit, the line set may be altered if the standard length was incorrect for installation.
(True/False)
4.8/5
(70)
When removing the rubber plugs from a line set, the hiss indicates that the tubing is not leaking.
(True/False)
4.8/5
(65)
If a duct system has large air leaks at the connections, what can be used to seal them up?
(Short Answer)
4.7/5
(83)
The typical gauge wire that is used in low voltage control circuits is ____________________ gauge.
(Short Answer)
4.9/5
(72)
What does a technician do before altering a precharged line set?
(Short Answer)
5.0/5
(79)
One drawback of using custom made, pre-fabricated duct sections is that ____.
(Multiple Choice)
4.9/5
(78)
The sun shining on the panels and coils of the condensing section will lower the efficiency of the unit.
(True/False)
4.8/5
(87)
After refrigerant lines have been installed, they should be evacuated to a(n) ____ vacuum.
(Multiple Choice)
4.8/5
(90)
Why is it necessary that the crankcase heater heats the compressor crankcase before starting the compressor?
(Essay)
4.7/5
(77)
An auxiliary drain pan under the unit is recommended when the evaporator is installed ____.
(Multiple Choice)
4.8/5
(79)
Showing 1 - 20 of 32
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)