Exam 7: Tubing and Piping
Exam 1: Heat and Pressure45 Questions
Exam 2: Matter and Energy32 Questions
Exam 3: Refrigeration and Refrigerants38 Questions
Exam 4: General Safety Practices31 Questions
Exam 5: Tools and Equipment30 Questions
Exam 6: Fasteners32 Questions
Exam 7: Tubing and Piping45 Questions
Exam 8: Leak Detection, System Evacuation and System Clean-Up33 Questions
Exam 9: Refrigerant and Oil Chemistry and Managementrecovery, Recycling, Reclaiming, and Retrofitting39 Questions
Exam 10: System Charging27 Questions
Exam 11: Calibrating Instruments34 Questions
Exam 12: Basic Electricity and Magnetism46 Questions
Exam 13: Introduction to Automatic Controls30 Questions
Exam 14: Automatic Control Components and Applications34 Questions
Exam 15: Troubleshooting Basic Controls33 Questions
Exam 16: Advanced Automatic Controlsdirect Digital Controls Ddc and Pneumatics35 Questions
Exam 17: Types of Electric Motors36 Questions
Exam 18: Application of Motors33 Questions
Exam 19: Motor Controls31 Questions
Exam 20: Troubleshooting Electric Motors30 Questions
Exam 21: Evaporators and the Refrigeration System37 Questions
Exam 22: Condensers35 Questions
Exam 23: Compressors35 Questions
Exam 24: Expansion Devices29 Questions
Exam 25: Special Refrigeration System Components35 Questions
Exam 26: Application of Refrigeration Systems34 Questions
Exam 27: Commercial Ice Machines35 Questions
Exam 28: Special Refrigeration Applications27 Questions
Exam 29: Troubleshooting and Typical Operating Conditions for Commercial Refrigeration34 Questions
Exam 30: Electric Heat29 Questions
Exam 31: Gas Heat27 Questions
Exam 32: Oil Heat35 Questions
Exam 33: Hydronic Heat35 Questions
Exam 34: Indoor Air Quality35 Questions
Exam 35: Comfort and Psychrometrics35 Questions
Exam 36: Refrigeration Applied to Air Conditioning31 Questions
Exam 37: Air Distribution and Balance35 Questions
Exam 38: Installation32 Questions
Exam 39: Residential Energy Auditing35 Questions
Exam 40: Typical Operating Conditions25 Questions
Exam 41: Troubleshooting28 Questions
Exam 42: Heat Gain and Heat Loss in Buildings35 Questions
Exam 43: Air Source Heat Pumps35 Questions
Exam 44: Geothermal Heat Pumps31 Questions
Exam 45: Domestic Refrigerators and Freezers35 Questions
Exam 46: Room Air Conditioners34 Questions
Exam 47: High-Pressure, Low-Pressure, and Absorption Chilled-Water Systems35 Questions
Exam 48: Cooling Towers and Pumps30 Questions
Exam 49: Operation, Maintenance, and Troubleshooting of Chilled-Water Air Conditioning Systems28 Questions
Exam 50: Commercial Rooftop, Packaged, Variable Refrigerant Flow, and Variable Air Volume Systems35 Questions
Select questions type
The copper tubing used in the field piping of refrigeration systems is type ____________________.
(Short Answer)
4.7/5
(72)
The abbreviation for the plastic pipe used in high pressure systems at low temperature is ____________________.
(Short Answer)
4.7/5
(94)
In the thread specification 1/2-14 NPT, the 14 stands for ____________________.
(Short Answer)
5.0/5
(78)
In the thread specification 1/2-14 NPT, the 1/2 is the ____________________.
(Short Answer)
5.0/5
(86)
Filler materials used in the high temperature connection of copper joints are composed of ____.
(Multiple Choice)
4.8/5
(76)
ABS and PVC pipe can be used to carry the new blended refrigerants in low temperature applications.
(True/False)
4.9/5
(95)
The size indicated for the diameter of copper tubing used for plumbing is the ____.
(Multiple Choice)
4.9/5
(78)
An air-acetylene unit usually consists of a B tank of acetylene gas, a regulator, a hose, and a torch .
(True/False)
4.8/5
(74)
The abbreviation for the plastic pipe used in hot and cold water supply systems is ____________________.
(Short Answer)
4.9/5
(69)
DWV copper stands for drain, waste and vent and is also a lightweight copper not typically used in the HVACR industry as far as refrigerant-carrying applications are concerned.
(True/False)
4.8/5
(85)
When soldering, the technician should heat the solder with the torch to allow it to melt.
(True/False)
4.9/5
(79)
Four tools that are needed to properly prepare and thread steel pipe are the pipe cutter, reamer, threader, and ____________________.
(Short Answer)
4.9/5
(77)
95/5 tin-antimony solder can be used in any part of a refrigeration system.
(True/False)
4.8/5
(75)
The abbreviation for the plastic pipe used in systems for water and gas supply lines and irrigation systems is ____________________.
(Short Answer)
4.8/5
(94)
The end of a piece of a steel pipe is reamed after it is cut with a pipe cutter to make it easier to start the thread die.
(True/False)
4.7/5
(81)
When joining steel pipe, a ____ should be applied to the threads before connecting.
(Multiple Choice)
4.8/5
(84)
Showing 21 - 40 of 45
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)