Exam 5: Quality and Performance
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
Regarding control charts,changing from two-sigma limits to three-sigma limits:
(Multiple Choice)
4.8/5
(68)
Two types of control charts useful for variable quality measures are the ________ and the ________.
(Essay)
4.9/5
(83)
The upper and lower specifications for a service are 10 min.and 8 min. ,respectively.The process average is 9 min.and the process capability ratio is 1.33.What is the process standard deviation?
(Multiple Choice)
4.8/5
(75)
A bank randomly looks at loan applications and checks them for errors.Ten applications and the number of errors identified on the applications are found in the following table.When the process is working correctly,the average number of errors found is 2.Construct a c-chart to determine if the process is in control.

(Essay)
4.9/5
(78)
In acceptance sampling,when the random sample passes the buyer's incoming test (low number of defects found),the next action taken is to:
(Multiple Choice)
4.7/5
(72)
A(n)________ specifies the sample size,the time between successive samples,and decision rules that determine when action should be taken.
(Essay)
4.8/5
(72)
The 15-year-old car didn't dazzle students or members of the opposite sex,but it started every morning and evening and got the professor to his destination on time,thereby scoring high on the:
(Multiple Choice)
4.9/5
(84)
Regarding control charts,changing from three-sigma limits to two-sigma limits:
(Multiple Choice)
4.9/5
(94)
A manufacturer embarking on a Six Sigma program sets the goal of having true Six Sigma capability for all processes by the end of the month.If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.70,what must happen with the process standard deviation?
(Multiple Choice)
4.9/5
(81)
Historically,the average proportion of defective bars has been 0.015.Samples will be of 100 bars each.Construct a p-chart using z = 3.Suppose a sample had 0.07 defectives.What would you do?
(Multiple Choice)
4.8/5
(62)
External failure costs arise when a defect is discovered after the customer has received the product or service.
(True/False)
4.8/5
(79)
The UCL and LCL for an
chart are 100 ounces and 95 ounces,respectively.The sample size is 5.The inspector looks at the very next unit and finds that it is 108 ounces.What can you conclude? Why?
(Essay)
4.8/5
(74)
Which step of the Six Sigma DMAIC procedure applies tools such as Pareto charts and cause-and-effect diagrams to determine where major process redesign may be necessary?
(Multiple Choice)
4.8/5
(78)
When considering the plan-do-study-act cycle for problem solving,quantitative goals are set for process improvement in the ________ step.
(Multiple Choice)
4.9/5
(67)
The central line on a p-chart is 0.50 with a UCL of 0.65 and an LCL of 0.35.The results of the next six samples are 0.60,0.37,0.45,0.48,0.45,and 0.42.What should you do?
(Multiple Choice)
4.9/5
(86)
Table 5.3
-Four samples of 100 each were taken from an assembly line,with the following results:
Using the historical average as the central line of the chart,which one of the following is the limit for an attributes control chart with z = 2?
(Multiple Choice)
4.9/5
(70)
Showing 121 - 140 of 223
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)