Exam 5: Quality and Performance
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
Strategic planning is given the most weight among the Baldrige Performance Excellence Program.
(True/False)
4.9/5
(93)
A company measures their Taguchi quality loss function for a product that has a nominal value of 10.The loss function os governed by a parabola,L(x)= k(x-T)2 where T is the nominal value and x is any x-axis value.If the loss curve is as shown in the figure,what is the value of the constant k? 
(Essay)
4.8/5
(87)
A manufacturer embarking on a Six Sigma program sets the goal of having true Six Sigma capability for all processes by the end of the month.If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.25,what must happen with the process standard deviation?
(Multiple Choice)
4.8/5
(83)
Table 5.1
Factors for Calculating Three-Sigma Limits for the
Chart and R-Chart
Source: 1950 ASTM Manual on Quality Control of Materials,copyright American Society for Testing Materials.Reprinted with permission.
-A milling operation has historically produced an average thickness of 0.005 inch with an average range of 0.0015 inch.Currently,the first three items from each batch of 20 are inspected.Use Table 5.1.What is the value of lower control limit for the x-bar chart if the sample size is increased to 6?
(Multiple Choice)
4.8/5
(71)
Which of the following statements relating to total quality management and Six Sigma is true?
(Multiple Choice)
4.7/5
(75)
Provide examples of the three main tenets of total quality management as applied to this operations management course.
(Essay)
4.8/5
(74)
The process
and R-charts are developed using a sample size of 5,but the technician mistakenly looks up A2,D3,and D4 values for a sample size of 7.If these charts are put into daily use,the manufacturer will mistakenly ship more bad product than had the charts been constructed correctly.
(True/False)
4.8/5
(83)
Which one of the following is considered to be an appraisal cost?
(Multiple Choice)
4.7/5
(79)
People often evaluate the quality of a service on the basis of psychological impressions.
(True/False)
4.8/5
(98)
The international standard that is applied to determine a company's "environmental friendliness" is:
(Multiple Choice)
4.9/5
(88)
A metal-cutting operation has a target value of 20 and consistently averages 19.8 with a standard deviation of 0.5.The design engineers have established an upper specification limit of 22 and a lower specification limit of 18.What is the process capability ratio?
(Multiple Choice)
4.8/5
(84)
Service time is targeted for 15 minutes with an upper and lower specification of 16 and 14 min. ,respectively.The process standard deviation is 0.2 min.and the process average is 14.8 min.What is the process capability ratio?
(Multiple Choice)
4.9/5
(75)
As he entered his broker's office for the first time,the young associate professor was dazzled by its tasteful accoutrements and the offer of a double tall split shot skinny hazelnut latte.He knew his lottery winnings would be safe here,thanks to his:
(Multiple Choice)
4.9/5
(70)
________ are small groups of supervisors and employees who meet to identify,analyze,and solve production and quality problems.
(Essay)
4.8/5
(72)
At which of the following steps will the cost of detecting product defects be the highest?
(Multiple Choice)
4.9/5
(85)
In acceptance sampling,the ________ is the proportion defective that the buyer will allow in an incoming shipment.
(Essay)
4.9/5
(78)
Table 5.3
-Samples of 100 checks each were taken at a bank from an encoding machine (which records the amount of a check)over a five-day period.Details are summarized in Table 5.3.If the bank were to use the average proportion defective from these five samples as the central line for a process control chart,what would be the central line?
(Multiple Choice)
4.8/5
(76)
Six sigma teacher can attain different level titles,based on their experience and level of achievement.What is the highest level a Six Sigma teacher can reach?
(Multiple Choice)
4.9/5
(87)
________ is a comprehensive and flexible system for achieving,sustaining,and maximizing business success through intensive data analysis and process management,improvement and reengineering.
(Essay)
4.9/5
(82)
Showing 61 - 80 of 223
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)