Exam 5: Quality and Performance

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A company is interested in monitoring the average time it takes to serve its customers.An appropriate control chart would be:

(Multiple Choice)
4.8/5
(84)

A process is monitored with a control chart.The process is correctly judged to be in-control once the results from the most recent sample are plotted.Therefore,all of the output produced at that time is good.

(True/False)
5.0/5
(87)

Explain the difference between the Baldrige Performance Excellence Program and ISO 9001:2008.

(Essay)
4.8/5
(84)

A hotel tracks the number of complaints per month.When the process is in control,there is an average of 35 complaints per month.Assume that a 2-sigma control limit is used.What is the upper control limit?

(Multiple Choice)
4.9/5
(77)

Which step of the Six Sigma DMAIC procedure monitors the process to make sure high performance levels are maintained?

(Multiple Choice)
4.9/5
(81)

A company is interested in monitoring the variability in the weight of the fertilizer bags it produces.An appropriate control chart would be:

(Multiple Choice)
4.8/5
(83)

Statistical process control (SPC)is the application of statistical techniques to determine whether a quantity of material should be accepted or rejected.

(True/False)
4.8/5
(82)

Table 5.3 Table 5.3    -Use the information from Table 5.3.What is the upper control limit (UCL)if the bank were to use z = 2 and a sample size of 100? -Use the information from Table 5.3.What is the upper control limit (UCL)if the bank were to use z = 2 and a sample size of 100?

(Multiple Choice)
4.7/5
(71)

Process capability can be addressed when:

(Multiple Choice)
4.8/5
(75)

Why is employee empowerment important in a total quality management program?

(Essay)
4.8/5
(77)

A manufacturer embarking on a Six Sigma program sets the goal of having true Six Sigma capability for all processes by the end of the month.If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.5,what must happen with the process standard deviation?

(Multiple Choice)
4.9/5
(75)

A sampling plan is best for evaluating quality when: (1)Inspection costs are high (2)Inspection costs are low (3)Non-destructive testing is available (4)Destructive testing is required

(Multiple Choice)
4.9/5
(83)

Which alternative will increase the probability of detecting a shift in the process average?

(Multiple Choice)
4.9/5
(71)

Historically,the average proportion of defective bars has been 0.015.Samples will be of 100 bars each.Construct a p-chart using z = 3.Suppose a sample had 0.04 defectives.What would you do?

(Multiple Choice)
4.8/5
(88)

"Quality at the source" implies:

(Multiple Choice)
4.9/5
(85)

A firm that has embraced the notion of quality at the source is more likely to have:

(Multiple Choice)
4.9/5
(88)

If an x-bar chart is constructed using the data in Table 5.4,what conclusion can be reached?

(Multiple Choice)
4.7/5
(77)

A metal-cutting operation has a target value of 20 and consistently averages 19.8 with a standard deviation of 0.5.The design engineers have established an upper specification limit of 22 and a lower specification limit of 18.What is the process capability index?

(Multiple Choice)
4.8/5
(81)

When considering the plan-do-study-act cycle for problem solving,instructing other employees in the use of the new process occurs in the ________ step.

(Multiple Choice)
4.7/5
(84)

Historically,the average time to service a customer complaint has been 3 days and the standard deviation has been 0.50 day.Management would like to specify the control limits for an Historically,the average time to service a customer complaint has been 3 days and the standard deviation has been 0.50 day.Management would like to specify the control limits for an   chart with a sample size of 10- and 3- sigma limits.Suppose the next sample of 10 yielded the following result: 3.2,2.1,3.6,2.8,3.9,3.5,2.7,4.1,2.6,and 3.3.What conclusion can be drawn? chart with a sample size of 10- and 3- sigma limits.Suppose the next sample of 10 yielded the following result: 3.2,2.1,3.6,2.8,3.9,3.5,2.7,4.1,2.6,and 3.3.What conclusion can be drawn?

(Multiple Choice)
4.8/5
(88)
Showing 181 - 200 of 223
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)