Exam 3: Project Management
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
An assumption of three-activity-time CPM analysis is that the activity time estimates conform to the beta distribution.Which of the following is a valid criticism of this assumption?
(Multiple Choice)
4.7/5
(86)
What is that sequence of activities that consume the longest amount of time in a project network of activities called?
(Short Answer)
4.9/5
(92)
Which of the following is a graphic project report used in project management?
(Multiple Choice)
4.8/5
(81)
The critical path of activities in a project is the sequence of activities that form the shortest chain in a project network of activities.
(True/False)
4.9/5
(92)
You have just performed a Single Time Estimate CPM analysis and have found that more than one path through the project network has zero slack values.What can you conclude?
(Multiple Choice)
4.9/5
(73)
Describe how CPM handles the trade-offs between time and cost in the scheduling of a project?
(Essay)
4.7/5
(78)
In a CPM analysis if you subtract the early finish from the late finish the result is the activity's slack time.
(True/False)
4.9/5
(62)
To calculate the variances of activity times in CPM analysis we must use all three time estimates (i.e. ,optimistic,most likely and pessimistic time estimates).
(True/False)
4.9/5
(66)
A series of projects that are organized in such a way that each project utilizes people from different functional areas is using which of the following organizational structures?
(Multiple Choice)
4.8/5
(78)
The "Z" value used to calculate the probabilities in CPM analysis is based on the Beta probability distribution.
(True/False)
4.7/5
(59)
Project Management can be defined as planning,directing and controlling resources to meet the technical,cost and time constraints of the project.
(True/False)
4.7/5
(87)
Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs. Immediate Normal Crash Normal Crash Activity Predecessor Time Time Cost Cost A None 3 2 \ 200 \ 400 B A 4 3 \ 300 \ 600 C A 1 1 \ 200 \ 200 D B and C 3 2 \ 500 \ 550 E D 2 1 \ 500 \ 900
What are the total time of this project and total normal cost?
(Multiple Choice)
4.7/5
(82)
The second step in managing a project is writing the Statement of Work (SOW).
(True/False)
4.9/5
(73)
A disadvantage of a matrix project organizational structure is that a project manager is held responsible for successful completion of the project.
(True/False)
5.0/5
(78)
The work breakdown structure (WBS)defines a hierarchy of project tasks,subtasks and work packages.
(True/False)
4.9/5
(84)
Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs. Immediate Normal Crash Normal Crash Activity Predecessor Time Time Cost Cost A None 3 2 \ 200 \ 400 B A 4 3 \ 300 \ 600 C A 1 1 \ 300 \ 300 D B and C 3 2 \ 500 \ 550 E D 2 1 \ 500 \ 900
If you crash this project to reduce the total time by one day what is the total time of the project and total cost?
(Multiple Choice)
4.7/5
(78)
A company wants to use CPM analysis to manage their project.One of the activities that make up the project has an uncertain duration.Three estimates have been given to determine this activity's duration.The estimates are optimistically 1 hour,most likely 5 hours and pessimistic 6 hours.Using the three activity time estimation procedure for CPM,what is the expected time this activity will take?
(Multiple Choice)
4.7/5
(84)
Project management software available today combines CPM and other scheduling aids,like Gantt charting,to aid in tracking progress of project completion.
(True/False)
4.7/5
(73)
A company must perform a maintenance project consisting of seven activities.The activities,their predecessors and their respective time estimates are presented below: Immediate Activity Designation Predecessor Time in Days Break down both machines A None 3 Clean machine 1 B A 3 Clean machine 2 C A 3 Re-set machine 1 D B 4 Re-set machine 2 E C 2 Re-calibrate both machines F D and E 1 Final test G F 2
Using the Single Time Estimate CPM procedure,which activities make up the critical path?
(Multiple Choice)
4.9/5
(86)