Exam 7: Manufacturing Processes
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials. )It can make the part on a standard lathe for $250 per unit (also including materials. )It can make the part on a machining center for $50 per unit (also including materials. )The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit?
Free
(Essay)
4.9/5
(84)
Correct Answer:
If the quantity required is less than 100,purchase the part for $350 per unit.If the quantity needed is between 100 and 900,use the standard lathe.If the quantity needed is more than 900 but less than 2,500,use the numerically controlled lathe.If the quantity needed was greater than 2,500,the machining center is best.
(Std vs NC:$250*D+$10,000=$150*D+$100,000;$100*D=$90,000;D=900)
(Buy vs.Std:$350*D=$10,000+250*D;$100*D=$10,000;D=100)
(NC vs.Machining Ctr:$150*D+$100,000=$50*D+$350,000;$100*D=$250,000;D=2,500)
Once a choice of position on the product-process matrix is selected change is impossible.
Free
(True/False)
4.8/5
(73)
Correct Answer:
False
One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment,fixed costs and variable costs is break-even analysis.
Free
(True/False)
4.8/5
(88)
Correct Answer:
True
The choice of which process structure to select is generally a function of the volume requirements for the product.
(True/False)
4.8/5
(72)
You are hired as a consultant to decide if your client should purchase a new,highly specialized,piece of equipment.The product to be produced by this equipment is forecast to have a total world wide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?
(Multiple Choice)
4.9/5
(97)
The choice of which process structure to select is generally a function of the volume requirements for the product.
(True/False)
4.9/5
(75)
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
(True/False)
4.8/5
(81)
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?
(Multiple Choice)
4.9/5
(79)
A process flowchart uses the information presented in the assembly drawing and defines how parts go together and their order of assembly.
(True/False)
4.8/5
(85)
Describe the implications of the product-process matrix for process design in a competitive situation?
(Essay)
4.9/5
(82)
What is sometimes humorously referred to as a "gozinto chart"?
(Multiple Choice)
4.9/5
(73)
Which of the following is not a basic type of process structure?
(Multiple Choice)
4.8/5
(79)
The product-process matrix shows the relationship between process structures and product volume.
(True/False)
4.8/5
(81)
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?
(Multiple Choice)
4.8/5
(74)
In a factory,machine A has a ten minute set-up time per batch and a two minute per unit run time.Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The factory makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine,on which batches should machine B be used?
(Multiple Choice)
4.7/5
(84)
The most common production management tools used in planning and designing the process flow are assembly drawings,assembly charts,route sheets and flow process charts.
(True/False)
4.7/5
(76)
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $50.Ignoring inventory,how many units must the firm sell to break-even?
(Short Answer)
4.7/5
(64)
Which of the following is not considered a major process flow structure?
(Multiple Choice)
4.9/5
(84)
Showing 1 - 20 of 42