Exam 12: Lean Manufacturing
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
JIT is typically applied to non-repetitive manufacturing.
Free
(True/False)
4.9/5
(83)
Correct Answer:
False
In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 24 per hour,safety stock is 10% of the demand during lead time,the container size is 5.If the lead time to replenish an order is 5 hours,what number of kanban card sets is needed?
Free
(Short Answer)
4.9/5
(65)
Correct Answer:
27 (26.4)
Which of the following statements holds true for Kanban production control systems?
Free
(Multiple Choice)
4.8/5
(82)
Correct Answer:
B
Group technology includes the set of psychological tests and training exercises given to group workers to insure a high level of teamwork.
(True/False)
4.9/5
(70)
When implementing a lean production system a stabilized schedule is achieved using which of the following?
(Multiple Choice)
5.0/5
(79)
Lean production is a management philosophy and a pull system throughout the plant.
(True/False)
4.9/5
(72)
What are the five guidelines for implementing a lean supply chain presented by Womack and Jones,in their book Lean Thinking?
(Essay)
4.8/5
(81)
JIT manufacturing forces a firm to work with a lower water level despite safety hazards.
(True/False)
4.8/5
(83)
To implement a Kanban pull system the firm would do which of the following?
(Multiple Choice)
4.9/5
(88)
One of the many JIT techniques that have been successfully applied in service firms is leveling facility load.
(True/False)
4.8/5
(77)
JIT production means that we produce the product before it is required so the customer does not wait for the product.
(True/False)
4.8/5
(84)
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?
(Multiple Choice)
4.9/5
(73)
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour,the safety stock is 20% of the demand during lead time,the container size is 5 and the lead time to replenish an order is 5 hours,what is the number of Kanban card sets needed?
(Multiple Choice)
4.8/5
(74)
Preventive maintenance is emphasized in lean production to ensure the flows are not interrupted by downtime or malfunctioning equipment.
(True/False)
4.9/5
(76)
A focused factory network is a family of manufacturing facilities each producing components that are focused on a nearby large assembly facility.
(True/False)
4.8/5
(75)
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a Kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e. ,inventory holding costs + setup/ordering costs)of each?
(Multiple Choice)
4.8/5
(73)
Which of the following are elements that address elimination of waste under lean production?
(Multiple Choice)
4.8/5
(78)
A Kanban control system uses a signaling device to regulate JIT flows.
(True/False)
4.8/5
(70)
In Japan we would expect a focused factory to be small and have only somewhere between 30 and 1,000 workers.
(True/False)
5.0/5
(73)
A principle of value stream mapping is to concentrate on speeding up value-added operations.
(True/False)
4.8/5
(73)
Showing 1 - 20 of 74
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)