Exam 12: Lean Manufacturing
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
Group technology is a philosophy wherein similar parts are grouped together and the processes required to make the parts are arranged as a work cell.
(True/False)
4.9/5
(86)
Uniform plant loading means smoothing the production flow to dampen schedule variation.This practice is also known by which Japanese name?
(Short Answer)
4.9/5
(83)
In a lean production system we expect to see which of the following?
(Multiple Choice)
4.8/5
(94)
In designing a lean production facility layout a designer should do which of the following?
(Multiple Choice)
4.9/5
(96)
Which of the following are key inventory reduction targets under lean production?
(Multiple Choice)
4.9/5
(70)
Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.
(True/False)
4.9/5
(79)
In Japanese manufacturing automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.
(True/False)
4.9/5
(78)
Subcontractor networks are not very important in Japanese manufacturing.
(True/False)
4.8/5
(72)
In setting up a kanban control system and you need to determine the number of kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 2 hours,what number of kanban card sets is needed?
(Short Answer)
4.7/5
(74)
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 8 hours,what number of Kanban card sets is needed?
(Multiple Choice)
4.9/5
(75)
In implementing a lean production system you should work with suppliers to do which of the following?
(Multiple Choice)
4.8/5
(69)
Company unions in Japan exist to foster a cooperative relationship with management.
(True/False)
4.9/5
(83)
Uniform loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.
(True/False)
4.8/5
(86)
Which of the following is a lean production technique that has been successfully applied in service firms?
(Multiple Choice)
4.8/5
(86)
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?
(Multiple Choice)
4.9/5
(88)
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5% of the demand during lead time.The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours.Which of the following is the number of Kanban card sets necessary to support this situation?
(Multiple Choice)
4.7/5
(86)
One of the few JIT techniques that do not work well in service firms is demand-pull scheduling.
(True/False)
4.7/5
(80)
In the textbook the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.
(True/False)
4.7/5
(88)
Respect for people is a key to the Japanese improvement ideas in manufacturing.
(True/False)
4.8/5
(87)
Showing 21 - 40 of 74