Exam 12: Lean Manufacturing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A focused factory tends to be a small plant designed for one purpose.

(True/False)
4.8/5
(73)

In trying to implement a lean production system you should work with suppliers to do which of the following?

(Multiple Choice)
4.9/5
(75)

The Toyota Production System is predicated upon what two philosophies that are also central to the Japanese culture?

(Short Answer)
4.8/5
(76)

What seven design principles guide the design of lean supply chains?

(Essay)
4.9/5
(68)

"Kanban Squares" is an educational game played in Kanban training sessions.

(True/False)
4.8/5
(75)

Uniform loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.

(True/False)
4.8/5
(82)

You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25% of the demand during lead time.The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

(Multiple Choice)
4.9/5
(73)

One of the many JIT techniques that have been successfully applied in service firms is the eliminating of unnecessary activities.

(True/False)
4.7/5
(75)

Heijunka is a Japanese word that means to smooth the production flow.

(True/False)
4.8/5
(74)

Using the formula in the textbook the only parameters we need to determine the number of Kanban card sets is the average number of units demanded over some time period,the container size and the safety stock.

(True/False)
4.7/5
(92)

Name Fujio Cho's seven prominent types of waste to be eliminated.

(Essay)
4.8/5
(74)

Group technology cells help to eliminate movement and queue (waiting)time between operations.

(True/False)
4.9/5
(97)

The goal of JIT production is to drive all inventory queues lower.

(True/False)
4.7/5
(86)

Lean production is an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials,work in process and finished goods.

(True/False)
4.8/5
(98)

Lean production requires a "push & pull" system of inventory replenishment.

(True/False)
4.9/5
(66)

To implement a flow process in developing a lean system a firm might do which of the following?

(Multiple Choice)
4.8/5
(71)

To implement a flow process in developing a lean system a firm might do which of the following?

(Multiple Choice)
4.8/5
(76)

The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.

(True/False)
4.8/5
(79)

Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900's.

(True/False)
4.7/5
(71)

One of the many JIT techniques that have been successfully applied in service firms is the upgrading of quality.

(True/False)
4.8/5
(75)
Showing 41 - 60 of 74
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)