Exam 18: Material Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000 and the inventory on hand is 1,200?

(Multiple Choice)
4.8/5
(80)

An MRP program with a capacity requirements planning module allows rescheduling to try to Level capacity.

(True/False)
4.8/5
(77)

Computing the quantity of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.

(True/False)
4.8/5
(83)

In a net change MRP system requirements and schedules are considered rigid and never updated.

(True/False)
4.8/5
(94)

Which of the following can be used for lot sizing in an MRP system?

(Multiple Choice)
4.8/5
(84)

"Available to promise" is a term referring to unsold finished goods inventory.

(True/False)
4.8/5
(92)

Objectives of inventory management under an MRP system include which of the following?

(Multiple Choice)
4.8/5
(84)

What is the name for demand caused by the demand for a higher Level item?

(Short Answer)
4.8/5
(82)

The least unit cost method (LUC)of lot-sizing technique adds ordering,stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.

(True/False)
4.9/5
(86)

Net change MRP reflects the exact status of each item managed by the system in "real time". Goal: 3

(True/False)
4.8/5
(70)

Which of the following is a major reason that some MRP systems fail?

(Multiple Choice)
4.7/5
(96)

"Projected available balance" is a term referring to unsold finished goods inventory.

(True/False)
4.9/5
(70)

The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost,carrying cost and cost of stock-outs.

(True/False)
5.0/5
(85)

An improvement noted by many firms after implementation of MRP is which of the following?

(Multiple Choice)
4.9/5
(80)

Developing the master production schedule is done by disaggregating the aggregate production plan.

(True/False)
4.9/5
(83)

A lot-for-lot (L4L)lot sizing technique does not take into account setup costs or capacity limitations.

(True/False)
4.8/5
(86)

MRP stands for Manufacturing Requirements Planning.

(True/False)
4.9/5
(63)

Net change MRP systems are "activity" driven.

(True/False)
4.9/5
(89)

In MRP,how is demand information for a Level 0 (zero)item derived?

(Short Answer)
4.9/5
(93)

Which of the following is considered a primary report in an MRP system?

(Multiple Choice)
4.8/5
(79)
Showing 21 - 40 of 111