Exam 18: Material Requirements Planning
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000 and the inventory on hand is 1,200?
(Multiple Choice)
4.8/5
(80)
An MRP program with a capacity requirements planning module allows rescheduling to try to Level capacity.
(True/False)
4.8/5
(77)
Computing the quantity of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
(True/False)
4.8/5
(83)
In a net change MRP system requirements and schedules are considered rigid and never updated.
(True/False)
4.8/5
(94)
Which of the following can be used for lot sizing in an MRP system?
(Multiple Choice)
4.8/5
(84)
"Available to promise" is a term referring to unsold finished goods inventory.
(True/False)
4.8/5
(92)
Objectives of inventory management under an MRP system include which of the following?
(Multiple Choice)
4.8/5
(84)
What is the name for demand caused by the demand for a higher Level item?
(Short Answer)
4.8/5
(82)
The least unit cost method (LUC)of lot-sizing technique adds ordering,stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
(True/False)
4.9/5
(86)
Net change MRP reflects the exact status of each item managed by the system in "real time".
Goal: 3
(True/False)
4.8/5
(70)
Which of the following is a major reason that some MRP systems fail?
(Multiple Choice)
4.7/5
(96)
"Projected available balance" is a term referring to unsold finished goods inventory.
(True/False)
4.9/5
(70)
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost,carrying cost and cost of stock-outs.
(True/False)
5.0/5
(85)
An improvement noted by many firms after implementation of MRP is which of the following?
(Multiple Choice)
4.9/5
(80)
Developing the master production schedule is done by disaggregating the aggregate production plan.
(True/False)
4.9/5
(83)
A lot-for-lot (L4L)lot sizing technique does not take into account setup costs or capacity limitations.
(True/False)
4.8/5
(86)
In MRP,how is demand information for a Level 0 (zero)item derived?
(Short Answer)
4.9/5
(93)
Which of the following is considered a primary report in an MRP system?
(Multiple Choice)
4.8/5
(79)
Showing 21 - 40 of 111
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)