Exam 18: Material Requirements Planning
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
If you cannot provide a master production schedule (MPS)as an input file,you cannot run a material requirements planning (MRP)system.
(True/False)
4.8/5
(70)
Discuss the importance of inventory record accuracy to an MRP system?
(Essay)
4.9/5
(80)
Demand in for an item located in Level 3 of a product structure tree depends on demand for an item in the next higher Level.What is that Level called?
(Short Answer)
4.7/5
(93)
All firms maintain bill of materials (BOM)files,which are simply a sequencing of everything that goes into a final product.
(True/False)
4.9/5
(75)
The philosophy of material requirements planning is that materials should be expedited when their lack would delay the overall production schedule and de-expedited when the schedule falls behind and postpones their need.
(True/False)
4.8/5
(85)
To ensure good master scheduling,the master scheduler should do which of the following?
(Multiple Choice)
4.9/5
(76)
Computing the quantities of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
(True/False)
4.9/5
(76)
Time fences increase productivity by reducing the time spent waiting for each product to be produced.
(True/False)
4.9/5
(82)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?
(Multiple Choice)
4.8/5
(75)
In an MRP program,the program accesses the status of any file in specific periods called which of the following?
(Multiple Choice)
4.9/5
(80)
Which of the following is an input to the master production schedule (MPS)?
(Multiple Choice)
4.9/5
(65)
Which of the following is not a production activity report generated by MRP?
(Multiple Choice)
5.0/5
(82)
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
(True/False)
4.8/5
(74)
Which of the following industry types will not benefit greatly from the application of MRP?
(Multiple Choice)
4.9/5
(81)
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal?
(Multiple Choice)
4.9/5
(81)
What is the name given to the manufacturing software that combines MRP and JIT logic?
(Short Answer)
4.8/5
(83)
If annual demand is 12,000 units,annual holding cost is $15 per unit and setup cost per order is $25,which of the following is the EOQ lot size?
(Multiple Choice)
4.7/5
(85)
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become "lumpy".
(True/False)
5.0/5
(82)
Showing 41 - 60 of 111
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)