Exam 10: Quality Control
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
A process that exhibits random variability would be judged to be out of control.
(True/False)
4.9/5
(75)
A plot below the lower control limit on the range chart:
(I) should be ignored since lower variation is desirable.
(II) may be an indication that process variation has decreased.
(III) should be investigated for assignable cause.
(Multiple Choice)
4.8/5
(82)
A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Measurements Machine \#1 17 15 15 17 \#2 16 25 18 25 \#3 23 24 23 22 For upper and lower control limits of 23.29 and 16.71, which machine(s), if any, appear(s) to have an out-of-control process mean?
(Multiple Choice)
4.8/5
(82)
Given the following process control data for a quality attribute (three samples of size 400 each): Sample Defectives \#1 36 \#2 32 \#3 52 If the process is known to produce 11 percent defectives on average, using three-sigma control limits, do any of the sample proportions indicate an out-of-control process proportion of defectives?
(Short Answer)
4.9/5
(83)
An x-bar control chart can only be valid if the underlying population it measures is a normal distribution.
(True/False)
4.9/5
(70)
A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Measurements Machine \#1 17 15 15 17 \#2 16 25 18 25 \#3 23 24 23 22 What are the x-bar chart three-sigma upper and lower control limits?
(Multiple Choice)
4.7/5
(82)
Given the following process control data for a normally distributed quality variable (three samples of size four each): Measurements Machine \#1 15 14 15 12 \#2 18 16 20 16 \#3 16 17 16 17 If the process is known to have a mean of 15 and a standard deviation of 3, using three-sigma control limits, do any of the sample means indicate an out-of-control process mean?
(Short Answer)
4.9/5
(78)
A time-ordered plot of sample statistics is called a(n) ______ chart.
(Multiple Choice)
4.8/5
(79)
A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Measurements Machine \#1 17 15 15 17 \#2 16 25 18 25 \#3 23 24 23 22 What is the estimate of the sample average range based upon this limited sample?
(Multiple Choice)
4.9/5
(75)
Control limits used on process control charts are specifications established by design or customers.
(True/False)
4.9/5
(82)
Which of the following relationships must always be incorrect?
(Multiple Choice)
4.9/5
(81)
Given the following process control data for a quality attribute (three samples of size 400 each): Sample Defectives \#1 36 \#2 32 \#3 52 If the process proportion of defectives is unknown, what is the alpha risk (probability of Type I error) for upper and lower control limits of .115 and .085 respectively? .13 and .07? .145 and .055?
(Short Answer)
4.8/5
(81)
Construct the appropriate two-sigma control chart for the sample observations listed below. Observation 1 2 3 4 5 6 7 8 9 10 11 Num. defects per unit 9 4 3 5 6 3 4 2 3 2 3
(Essay)
4.9/5
(77)
A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Measurements Machine \#1 17 15 15 17 \#2 16 25 18 25 \#3 23 24 23 22 What is the estimate of the process mean for whenever it is under control?
(Multiple Choice)
4.7/5
(72)
Given the following process control data for a normally distributed quality variable (three samples of size four each): Measurements Machine \#1 15 14 15 12 \#2 18 16 20 16 \#3 16 17 16 17 If the process is known to have a mean of 15 and a standard deviation of 3, what are the three-sigma upper and lower control limits for an x-bar chart?
(Essay)
4.9/5
(83)
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Service Life (hours) Sample 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 If he uses upper and lower control limits of 520 and 480 hours, what is his risk (alpha) of concluding that service life is out of control when it is actually under control (Type I error)?
(Multiple Choice)
4.7/5
(82)
The Taguchi loss function suggests that the capability ratio can be improved by extending the spread between LCL and UCL.
(True/False)