Exam 10: Quality Control
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
The amount of inspection needed depends on __________ and __________.
(Multiple Choice)
4.9/5
(81)
Given the following control chart, would you say that the process appears to be performing appropriately? 
(Essay)
4.8/5
(84)
Quality control is making sure that processes are performing in an acceptable manner.
(True/False)
4.7/5
(88)
A control chart used to monitor the fraction of defectives generated by a process is the:
(Multiple Choice)
4.9/5
(82)
The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What is the estimate of the standard deviation of the sampling distribution for an instructor's sample proportion of failures?
(Multiple Choice)
4.7/5
(84)
Given the following process control data for a quality attribute (three samples of size 400 each): Sample Defectives \#1 36 \#2 32 \#3 52 If the process proportion of defectives is unknown, what are the upper and lower control limits for an alpha risk of .10? .05? .01?
(Short Answer)
4.8/5
(75)
If a process is performing as it should, it is still possible to obtain observations which are outside of which limits?
(I) tolerances
(II) control limits
(III) process variability
(Multiple Choice)
4.8/5
(82)
A quality analyst wants to construct a control chart for determining whether four machines, all producing the same product, are under control with regard to a particular quality attribute. Accordingly, she inspected 1,000 units of output from each machine in random samples, with the following results: Machine Total Defectives \#1 23 \#2 15 \#3 29 \#4 13 What is the estimate of the process proportion of defectives for whenever it is under control?
(Multiple Choice)
4.8/5
(88)
Quality control tools are not really used to fix quality so much as they are used to:
(Multiple Choice)
4.8/5
(79)
A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is under control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each: Weight (ounces) Day Monday 23 22 23 24 Tuesday 23 21 19 21 Wednesday 20 19 20 21 Thursday 18 19 20 19 Friday 18 20 22 20 What is the sample mean package weight for Thursday?
(Multiple Choice)
4.9/5
(88)
Given the following process control data for a quality attribute (three samples of size 400 each): Sample Defectives \#1 36 \#2 32 \#3 52 If the process proportion of defectives is unknown, what is the estimate of this proportion?
(Short Answer)
4.8/5
(76)
Run tests are useful in helping to identify nonrandom variations in a process.
(True/False)
4.8/5
(84)
Consider the following information: Observations 1 2 3 4 5 6 Num. of defects 10 18 13 15 9 12 The number of runs with respect to the sample median is:
(Multiple Choice)
4.9/5
(68)
Given the following process control data for a quality attribute (three samples of size 400 each): Sample Defectives \#1 36 \#2 32 \#3 52 If the process is known to produce 11 percent defectives on average, what is the mean of the sampling distribution of sample proportions for whenever this process is under control? The standard deviation?
(Short Answer)
4.8/5
(78)
The optimum level of inspection occurs when we catch at least 98.6 percent of the defects.
(True/False)
4.8/5
(87)
Given the following process control data for a normally distributed quality variable (three samples of size four each): Measurements Machine \#1 15 14 15 12 \#2 18 16 20 16 \#3 16 17 16 17 What is the sample mean for sample #1? #2? #3?
(Short Answer)
4.9/5
(89)
The assurance that processes are performing in an acceptable manner is the focus of:
(Multiple Choice)
4.9/5
(80)
Four samples of three observations each have been taken, with actual measurements (in centimeters) shown below. Construct three-sigma mean and range charts. Sample 1 2 3 4 12.3 11.9 12.0 12.1 12.2 12.2 12.2 11.8 12.1 12.2 11.8 11.8
Sample 1 2 3 4 Mean 12.2 12.1 12.0 11.9 Range .2 .3 4 .3
(Essay)
4.9/5
(87)
The process capability index (Cpk) may mislead if:
(I) the process is not stable.
(II) the process output is not normally distributed.
(III) the process is not centered.
(Multiple Choice)
5.0/5
(74)
Showing 81 - 100 of 141
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)