Exam 10: Quality Control
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
Studies on a machine that molds plastic water pipe indicate that when it is injecting 1-inch-diameter pipe, the process standard deviation is 0.05 inches. The 1-inch pipe has a specification of 1 inch plus or minus 0.10 inch. What is the process capability index (Cpk) if the long-run process mean is 1 inch?
(Multiple Choice)
4.8/5
(89)
Given the following process control data for a normally distributed quality variable (three samples of size four each): Measurements Machine \#1 15 14 15 12 \#2 18 16 20 16 \#3 16 17 16 17 If the process is known to have a mean of 15 and a standard deviation of 3, what is the alpha risk (probability of Type I error) for upper and lower control limits of 16.5 and 13.5 respectively? 18 and 12? 19.5 and 10.5?
(Short Answer)
4.9/5
(75)
The following data occurs chronologically from left to right: 15.2 19.7 16.0 11.1 14.8 14.5 The number of runs with respect to the sample median is:
(Multiple Choice)
4.8/5
(76)
_______ variation is a variation whose cause can be identified.
(Multiple Choice)
4.8/5
(74)
The sampling distribution can be assumed to be approximately normal even when the underlying process distribution is not normally distributed.
(True/False)
4.8/5
(81)
Given the following process control data for a quality attribute (three samples of size 400 each): Sample Defectives \#1 36 \#2 32 \#3 52 If the process is known to produce 11 percent defectives on average, what are the upper and lower control limits for an alpha risk of .10? .05? .01?
(Short Answer)
4.9/5
(88)
Control limits are based on multiples of the process standard deviation.
(True/False)
4.8/5
(87)
Given the following process control data for a quality attribute (three samples of size 400 each): Sample Defectives \#1 36 \#2 32 \#3 52 What is the sample proportion of defectives for sample #1? #2? #3?
(Short Answer)
5.0/5
(81)
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Service Life (hours) Sample 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 What is the sample mean service life for sample 2?
(Multiple Choice)
4.8/5
(72)
The number of defective parts in a sample is an example of variable data because it will "vary" from one sample to another.
(True/False)
5.0/5
(91)
The following chart depicts 16 sample means that were taken at periodic intervals and plotted on a control chart. Does the output appear to be random? 
(Essay)
4.8/5
(86)
Low-cost, high-volume items often require more intensive inspection than other types of items.
(True/False)
4.9/5
(86)
The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 Using .95 control limits (5 percent risk of Type I error), which instructor(s), if any, should he conclude is (are) out of control?
(Multiple Choice)
4.9/5
(91)
The amount of inspection needed is governed by the costs of inspection and the expected costs of passing defective items.
(True/False)
4.8/5
(94)
A control chart used to monitor the number of defects per unit is the:
(Multiple Choice)
4.8/5
(84)
The best way to assure quality is to use extensive inspection and control charts.
(True/False)
4.8/5
(83)
A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is under control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each: Weight (ounces) Day Monday 23 22 23 24 Tuesday 23 21 19 21 Wednesday 20 19 20 21 Thursday 18 19 20 19 Friday 18 20 22 20 What is the mean of the sampling distribution of sample means when this process is under control?
(Multiple Choice)
4.9/5
(77)
Run tests give managers an alternative to control charts; they are quicker and cost less.
(True/False)
4.7/5
(75)
The specification limit for a product is 8 cm and 10 cm. A process that produces the product has a mean of 9.5 cm and a standard deviation of 0.2 cm. What is the process capability, Cpk?
(Multiple Choice)
4.8/5
(69)
Showing 61 - 80 of 141
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)