Exam 10: Quality Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Patterns of data on a control chart suggest that the process may have nonrandom variation.

(True/False)
4.8/5
(85)

A shift in the process mean for a measured characteristic would most likely be detected by a:

(Multiple Choice)
4.8/5
(79)

Consider the following information: Observations 1 2 3 4 5 6 Num. of defects 10 18 13 15 9 12 The number of runs up and down for the preceding data is:

(Multiple Choice)
4.9/5
(87)

Acceptance sampling, when it is used, is used: (I) before production. (II) during production. (III) after production.

(Multiple Choice)
4.9/5
(78)

A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Service Life (hours) Sample 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 What is the standard deviation of the sampling distribution of sample means for whenever service life is in control?

(Multiple Choice)
4.7/5
(94)

Statistical process control focuses on the acceptability of process output.

(True/False)
4.8/5
(65)

An operator collected the following time series data from a process: 4.0 4.4 4.3 4.5 4.6 4.2 4.1 4.5 (A) Determine the number of A/B runs. (B) Determine the number of up/down runs.

(Essay)
4.8/5
(78)

A quality analyst wants to construct a control chart for determining whether four machines, all producing the same product, are under control with regard to a particular quality attribute. Accordingly, she inspected 1,000 units of output from each machine in random samples, with the following results: Machine Total Defectives \#1 23 \#2 15 \#3 29 \#4 13 What is the estimate of the standard deviation of the sampling distribution of sample proportions for whenever this process is under control?

(Multiple Choice)
4.8/5
(83)

A stent for use in coronary surgery requires a special coating. Specifications for this coating call for it to be at least 0.05 millimeters but no more than 0.15 millimeters. If, when the coating process is in control, the long-run average is 0.09 millimeters, what metric would be used to assess this process's capability?

(Short Answer)
4.9/5
(77)

A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is under control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each: Weight (ounces) Day Monday 23 22 23 24 Tuesday 23 21 19 21 Wednesday 20 19 20 21 Thursday 18 19 20 19 Friday 18 20 22 20 If he uses upper and lower control limits of 22 and 18 ounces, what is his risk (alpha) of concluding this process is out of control when it is actually in control (Type I error)?

(Multiple Choice)
4.8/5
(77)

Approving the effort that occurs during the production process is known as acceptance sampling.

(True/False)
4.9/5
(89)

A quality analyst wants to construct a control chart for determining whether four machines, all producing the same product, are under control with regard to a particular quality attribute. Accordingly, she inspected 1,000 units of output from each machine in random samples, with the following results: Machine Total Defectives \#1 23 \#2 15 \#3 29 \#4 13 For upper and lower control limits of .026 and .014, which machine(s), if any, appear(s) to be out-of-control for process proportion of defectives?

(Multiple Choice)
4.9/5
(66)

The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What are the .95 (5 percent risk of Type I error) upper and lower control limits for the p-chart?

(Multiple Choice)
4.9/5
(70)

The optimum level of inspection minimizes the sum of inspection costs and the cost of passing defectives.

(True/False)
4.7/5
(76)

The output of a process may not conform to specifications even though the process may be statistically "in control."

(True/False)
4.9/5
(75)

The basis for a statistical process control chart is a(the):

(Multiple Choice)
4.9/5
(86)

A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Measurements Machine \#1 17 15 15 17 \#2 16 25 18 25 \#3 23 24 23 22 What is the sample mean for machine #1?

(Multiple Choice)
4.8/5
(73)

The specifications for a product are 6 mm ± 0.1 mm. The process is known to operate at a mean of 6.05 with a standard deviation of 0.01 mm. What is the Cpk for this process?

(Multiple Choice)
4.8/5
(75)

A c-chart is used to monitor the number of defects per unit for process output.

(True/False)
4.8/5
(84)

A quality analyst wants to construct a control chart for determining whether four machines, all producing the same product, are under control with regard to a particular quality attribute. Accordingly, she inspected 1,000 units of output from each machine in random samples, with the following results: Machine Total Defectives \#1 23 \#2 15 \#3 29 \#4 13 What are the control chart upper and lower control limits for an alpha risk of .05?

(Multiple Choice)
4.8/5
(80)
Showing 41 - 60 of 141
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)