The critical path of activities in a project is the sequence of activities that form the shortest chain in a project network of activities.

(True/False)
4.8/5
(80)

You know when you have arrived at the optimal solution in using the time-cost CPM scheduling model analysis when what happens?

(Multiple Choice)
4.9/5
(84)

In the time-cost CPM model, cost is assumed to be a linear function of time.

(True/False)
4.8/5
(79)

An event unit package is a subdivision of a project.

(True/False)
5.0/5
(80)

In a CPM analysis, if you subtract the early start from the late start, the result is the activity's slack time.

(True/False)
4.8/5
(72)

A work breakdown structure is used in project management but it is not used when the critical path method is involved.

(True/False)
4.9/5
(75)

One of the disadvantages of a pure project organizational structure is that the project manager has full authority over the project.

(True/False)
4.7/5
(86)

What is the most basic requirement of an EVM system? _____________________________________________________________

(Essay)
4.7/5
(74)

Slack activity time is the difference between the early start and the late finish of a project activity time.

(True/False)
4.8/5
(81)

A simple project listing of five activities, their predecessors, and their respective time estimates are presented here: A simple project listing of five activities, their predecessors, and their respective time estimates are presented here:   Using the CPM, which activities have slack in this project? Using the CPM, which activities have slack in this project?

(Multiple Choice)
4.9/5
(77)

For an activity in a CPM analysis, the early start time is 8 and the late start time is 10.Which of the following statements is true?

(Multiple Choice)
4.8/5
(81)

In a CPM analysis, if you subtract the late finish from the early finish, the result is the activity's slack time.

(True/False)
4.8/5
(88)

Derivative projects are those that address incremental changes to products or processes.

(True/False)
4.8/5
(72)

Earned value management (EVM) is a technique for measuring project progress in an objective manner.

(True/False)
4.9/5
(82)

Calculating the early start and early finish times for each activity in a CPM analysis does not provide any useful information.

(True/False)
4.8/5
(75)

One of the assumptions made using CPM is that project activity sequence relationships can be specified and networked.

(True/False)
4.9/5
(83)

One of the advantages of a functional project organizational structure is that a team member can work on several projects.

(True/False)
4.7/5
(90)

The Gantt chart is an example of a project control chart.

(True/False)
4.8/5
(87)

Which of the following is a graphic project report used in project management?

(Multiple Choice)
4.9/5
(75)

The fact that organizations are flattening is one of the reasons that project management is important.

(True/False)
4.8/5
(89)