Exam 21: Material Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become "lumpy."

Free
(True/False)
4.8/5
(76)
Correct Answer:
Verified

True

The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.

Free
(True/False)
4.7/5
(88)
Correct Answer:
Verified

True

Lot-for-lot (L4L) is the most common lot-sizing technique.

Free
(True/False)
4.7/5
(92)
Correct Answer:
Verified

True

MRP is most valuable where a number of products are made in batches using the same productive equipment.

(True/False)
5.0/5
(77)

MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.

(True/False)
4.8/5
(71)

MRP stands for manufacturing requirements planning.

(True/False)
5.0/5
(77)

MRP is based on dependent demand.

(True/False)
5.0/5
(83)

Which of the following is considered a primary report in an MRP system?

(Multiple Choice)
4.9/5
(82)

If annual demand is 6,125 units, annual holding cost is $5 per unit, and setup cost per order is $50, which of the following is the EOQ lot size?

(Multiple Choice)
4.7/5
(90)

The least total cost method (LTC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.

(True/False)
4.9/5
(89)

When implemented correctly, MRP links all areas of the business.

(True/False)
4.7/5
(86)

What are the three main inputs to an MRP program? (1) _______________ (2) _______________ (3) _______________

(Essay)
4.8/5
(82)

MRP systems seek to achieve which of the following?

(Multiple Choice)
4.8/5
(99)

In a net change MRP system, requirements and schedules are updated whenever a transaction is processed that has an impact on the item.

(True/False)
4.8/5
(89)

A product tree can do which of the following?

(Multiple Choice)
4.8/5
(86)

Which of the following can be used for lot sizing in an MRP system?

(Multiple Choice)
4.9/5
(82)

Generally, determining lot sizes in MRP systems is simple.

(True/False)
4.9/5
(91)

If annual demand is 12,000 units, annual holding cost is $15 per unit, and setup cost per order is $25, which of the following is the EOQ lot size?

(Multiple Choice)
5.0/5
(78)

The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).

(True/False)
4.8/5
(82)

The least unit cost method (LUC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.

(True/False)
4.8/5
(72)
Showing 1 - 20 of 89