Exam 8: Facility Layout
Exam 1: Introduction84 Questions
Exam 2: Strategy54 Questions
Exam 3: Design of Products and Services58 Questions
Exam 4: Project Management78 Questions
Exam 5: Strategic Capacity Management64 Questions
Exam 6: Learning Curves60 Questions
Exam 7: Manufacturing Processes44 Questions
Exam 8: Facility Layout58 Questions
Exam 9: Service Processes67 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis57 Questions
Exam 12: Six Sigma Quality75 Questions
Exam 13: Statistical Quality Control73 Questions
Exam 14: Lean Supply Chains73 Questions
Exam 15: Logistics Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement78 Questions
Exam 17: Enterprise Resource Planning Systems47 Questions
Exam 18: Forecasting101 Questions
Exam 19: Sales and Operations Planning65 Questions
Exam 20: Inventory Management108 Questions
Exam 21: Material Requirements Planning89 Questions
Exam 22: Workcenter Scheduling72 Questions
Exam 23: Theory of Constraints72 Questions
Exam 24: Health Care69 Questions
Exam 25: Operations Consulting61 Questions
Select questions type
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure.The cycle time of the line is 10 minutes, and the sum of all that tasks required on the line is 60 minutes.Which of the following is the correct value for the resulting line's efficiency?
Free
(Multiple Choice)
4.9/5
(93)
Correct Answer:
C
As a general rule, manufacturing workstations should not be very close together.
Free
(True/False)
4.8/5
(84)
Correct Answer:
False
Using the assembly-line balancing procedure, which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?
Free
(Multiple Choice)
5.0/5
(74)
Correct Answer:
C
What are the main differences between facility layout for manufacturing and for retail service establishments?
(Essay)
4.7/5
(76)
A workcenter layout is similar to the basic production layout format of job-shop.
(True/False)
4.7/5
(74)
A project layout is characterized by a relatively low number of production units in comparison with workcenter and assembly-line formats.
(True/False)
4.8/5
(92)
Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1,440 and the required output per day in units is 2000?
(Multiple Choice)
4.9/5
(81)
Which of the following is not a step in developing a manufacturing cell layout?
(Multiple Choice)
4.7/5
(82)
The objective of a mixed-model line layout is to meet the demand for a variety of products and avoid building high inventories.
(True/False)
4.8/5
(73)
A manufacturing cell groups identical machines together to work on products having similar shapes and processing requirements.
(True/False)
4.7/5
(88)
We would expect to see in a manufacturing cell layout which of the following?
(Multiple Choice)
4.8/5
(95)
Which of the following is not considered an input to the layout decision in facility layout analysis?
(Multiple Choice)
4.8/5
(82)
In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?
(Multiple Choice)
4.8/5
(77)
In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?
(Multiple Choice)
4.9/5
(78)
Some of the suggestions for a good layout for manufacturing and back-office operations include which of the following?
(Multiple Choice)
4.7/5
(74)
Which of the following is not a basic type of production layout format?
(Multiple Choice)
4.8/5
(78)
When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?
(Multiple Choice)
4.9/5
(79)
If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes, the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.
(True/False)
4.7/5
(74)
Some of the suggestions for a good layout for face-to-face services include which of the following?
(Multiple Choice)
4.9/5
(83)
Showing 1 - 20 of 58
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)