Exam 14: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Group technology includes the set of psychological tests and training exercises given to group workers to ensure a high level of teamwork.

Free
(True/False)
4.8/5
(77)
Correct Answer:
Verified

False

To implement lean production schedules, a firm would do which of the following?

Free
(Multiple Choice)
4.9/5
(80)
Correct Answer:
Verified

A

One of the many lean techniques that have been successfully applied in service firms is leveling facility load.

Free
(True/False)
4.8/5
(80)
Correct Answer:
Verified

True

One of the few lean techniques that does not work well in service firms is demand-pull scheduling.

(True/False)
4.8/5
(80)

JIT manufacturing forces a firm to work with a lower water level despite safety hazards.

(True/False)
4.8/5
(73)

Automation is a key to lean procurement.

(True/False)
5.0/5
(86)

Explain why lean manufacturing requires a stable demand environment.

(Essay)
4.8/5
(71)

"Quality at the source" requires factory workers to become their own inspectors.

(True/False)
4.8/5
(84)

Which of the following are related to lean production?

(Multiple Choice)
4.9/5
(72)

An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced is called which of the following?

(Multiple Choice)
5.0/5
(87)

Applying lean concepts in manufacturing balances increases in cost with quality improvement.

(True/False)
4.8/5
(79)

"Kanban squares" is an educational game played in kanban training sessions.

(True/False)
5.0/5
(77)

In setting up a Kanban control system you need to determine the number of kanban card sets needed.If assume the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?

(Multiple Choice)
5.0/5
(86)

In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

(Multiple Choice)
4.7/5
(86)

In implementing a lean production system you should work with suppliers to do which of the following?

(Multiple Choice)
4.9/5
(63)

A principle of value stream mapping is to concentrate on speeding up value-added operations.

(True/False)
4.8/5
(79)

In the textbook, the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.

(True/False)
4.7/5
(89)

Value stream mapping is used to visualize product flows through various processing steps.

(True/False)
4.8/5
(89)

In a lean production system, we expect to see which of the following?

(Multiple Choice)
4.9/5
(93)

A kanban control system uses a signaling device to regulate JIT flows.

(True/False)
4.9/5
(84)
Showing 1 - 20 of 73
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)