Exam 14: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

When implementing a lean production system, a stabilized schedule is achieved using which of the following?

(Multiple Choice)
4.9/5
(83)

In implementing a lean production system, you should work with suppliers to do which of the following?

(Multiple Choice)
4.8/5
(71)

Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities.

(True/False)
5.0/5
(90)

Value stream mapping is used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant.

(True/False)
4.9/5
(86)

A kaizen burst is a symbol on a value stream map.

(True/False)
4.9/5
(96)

Which of the following is not listed in the textbook as a component of a lean supply chain?

(Multiple Choice)
4.9/5
(80)

Group technology cells help to eliminate movement and queue (waiting) time between operations.

(True/False)
4.8/5
(83)

The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.

(True/False)
4.8/5
(70)

To develop a lean manufacturing system a firm might do which of the following?

(Multiple Choice)
4.9/5
(70)

In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?

(Multiple Choice)
4.8/5
(77)

Firms in Japan tend to have short-term relationships with their suppliers and customers.

(True/False)
4.9/5
(80)

JIT production means that we produce the product before it is required so the customer does not wait for the product.

(True/False)
4.9/5
(80)

To implement a flow process in developing a lean system a firm might do which of the following?

(Multiple Choice)
4.8/5
(85)

Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900s.

(True/False)
4.8/5
(93)

In designing a lean production facility layout, a designer should do which of the following?

(Multiple Choice)
4.9/5
(96)

Lean production requires a "push and pull" system of inventory replenishment.

(True/False)
4.9/5
(85)

Kanban means "symbol" or "box" in Japanese.

(True/False)
4.7/5
(75)

Value stream mapping involves materials, not information.

(True/False)
4.8/5
(72)

You have been called in as a consultant to set up a kanban control system.The first thing you do is to determine the number of kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5 percent of the demand during lead time.The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours.Which of the following is the number of kanban card sets necessary to support this situation?

(Multiple Choice)
4.8/5
(76)

You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25 percent of the demand during lead time.The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

(Multiple Choice)
5.0/5
(68)
Showing 21 - 40 of 73
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)